Similar Projects
Region 1 - Bottleneck Mitigation at SH83 and SH88
Infrastructure
Bidding
$5,000,000 CJ est. value
Aurora, CO 80014

RFP D/B - Gandi Park Carrier Neutral Location (CNL) and Wireless Communication Tower
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Collbran, CO 81624

Joint and Crack Sealing
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Fairplay, CO 80440

Construct Vehicle Storage for High-Altitude Army Aviation Training Site (HAATS)
New Construction, Infrastructure - 6,191 SF
Post-Bid
$1,700,000 CJ est. value
Gypsum, CO 81637

Precast Primary Junction Vaults
Term Contract
Post-Bid
Fort Collins, CO 80521

NCCWTP Concrete Repairs
Results
$100,000 to $130,000 est. value
Denver, CO

2022 Concrete Replacement Project
Infrastructure
Results
$160,585 est. value
Louisville, CO

2023 Paving Program
Infrastructure
Construction
$760,000 CJ est. value
Firestone, CO 80520

Pikes Peak Parking Restoration Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Denver, CO 80249

2022 Chip Seal Program
Infrastructure
Post-Bid
$200,000 CJ est. value
Firestone, CO 80520

Campus-Wide Concrete Removal and Replacement
Alteration
Results
Durango, CO 81301

28 th Street & Colorado Avenue Protected Intersection Project
Infrastructure
Bidding
$200,000 CJ est. value
Boulder, CO 80303

Concrete Replacement 2022
Alteration
Post-Bid
$400,000 est. value
Winter Park, CO

College Mesa Water Treatment Plant Gravity Block Retaining Wall - Concrete Flatwork Project
Alteration
Results
Durango, CO 81301

Request For Qualifications - Open Space & Mountain Parks Shale and Eagle Trail Construction City of Boulder
Infrastructure
Bidding
$200,000 CJ est. value
Boulder, CO 80302

Last Updated 09/21/2023 05:12 AM
Project Title

2023 Maplewood Concrete Rehabilitation - GURA - Bid

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $727,808 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000324070 PROJECT DESCRIPTION The 2023 Maplewood Neighborhood Concrete Rehabilitation Notice To Proceed will be issued on or about July 5th, 2023. Work shall be completed by September 30th, 2023. The work, in general, consists of removal and replacement concrete infrastructure including, but not limited to, curb & gutter, sidewalks, access ramps, cross pans, alley aprons, etc. The Contractor shall adhere to all traffic control and erosion control standards including submission of documents, reporting and maintenance for all locations. The work in this contract will consist of furnishing all labor, equipment, and materials for the replacement or construction of designated concrete curbs, gutters, pavements, concrete driveways, sidewalks, handicap ramps, landscaping restoration, possible reconstruction of inlet tops and other related and incidental work required to complete the project. question Deadline 07/11/2023 at 2:00 PM MT Questions are submitted online No Questions pertaining to the project may be directed to purchasing@greeleygov.com before July 11, 2023, at 2:00PM (MST). Notice to Proceed 8/8/2023 Work shall be completed by September 30th, 2023

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents