Similar Projects
Nelson Property Group Residential
New Construction - 7,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rock Hill, SC

Legal Remedy Brewing Mixed Use
New Construction, Infrastructure - 9,800 SF
Conception
$4,000,000 CJ est. value
Rock Hill, SC 29732

The Reserve At Rock Hill Independent Living Facility
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Rock Hill, SC 29730

Firetower Logistics @ 77
New Construction, Infrastructure - 1,000,000 SF
Design
$30,000,000 CJ est. value
Rock Hill, SC 29730

RFQ Engineering - Upper and Lower Reservoir Dam Design, Repair, and Remediation
Infrastructure
Bidding
$240,000 CJ est. value
York, SC 29745

Safety Improvement York County
Infrastructure
Bidding
$2,100,000 CJ est. value
York, SC 29745

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Boiler-Chiller Underground Water Line Replacement
Alteration
Post-Bid
$500,000 to $650,000 est. value
Rock Hill, SC 29730

Highway 274 Force Main Replacement
Infrastructure
Results
SC

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

175 Black Street Apartments
New Construction, Infrastructure - 60,530 SF
Construction
$20,000,000 CJ est. value
Rock Hill, SC 29730

Rock Hill Herald Redevelopment
Demolition, New Construction, Infrastructure - 26,000 SF
Pending Verification
$355,000,000 CJ est. value
Rock Hill, SC 29730

Carolina Cardiology Associates Ambulatory Surgery Center
New Construction, Infrastructure - 4,415 SF
Pending Verification
$2,031,975 CJ est. value
Rock Hill, SC 29732

Nichols Store /Rock Hill
New Construction, Infrastructure - 11,750 SF
Conception
$3,000,000 CJ est. value
Rock Hill, SC 29730

Rock Hill Convenience Store
New Construction, Infrastructure - 5,000 SF
Design
$1,000,000 CJ est. value
Rock Hill, SC 29730

Last Updated 03/30/2023 02:36 AM
Project Title

Celanese/Rosewood Outfall - Cleaned/Reclean - City of Rock Hill

Physical Address View project details and contacts
City, State (County) Rock Hill, SC 29732   (York County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Celanese/Rosewood Outfall Cleaned/Reclean - Evaluate & Possible Point Repair A detailed scope has not yet been determined. As March 30, 2023, this project is currently in the FY 2023-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents