Similar Projects
Design Build Services for the Shady Side Drive Slope Stabilization Project
Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
Clayton, GA 30525

Reeves Road Drainage Improvements
Infrastructure
Bidding
GA

Repair of Storm Water Drainage Systems
Post-Bid
Snellville, GA 30078

Concrete Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA 30501

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Smith Street Drainage Improvements
Results
Hagan, GA 30429

Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance Services - District 5
Infrastructure
Bidding

West Main Street Draingage Improvements
Post-Bid
Statesboro, GA

Whitfield Street Drainage Improvements
Results
Smyrna, GA

Dobbs Road Drainage Improvements
Infrastructure
Bidding
Woodstock, GA

Beechwood Circle Drainage Replacement
Post-Bid
Lawrenceville, GA 30046

Rutledge State Prison Slope Stability Project
Results
Columbus, GA 31907

Main Street at Linton Drainage Improvements
Infrastructure
Bidding
Woodstock, GA

Dressler Ditch Improvements
Post-Bid
Rincon, GA 31326

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

Last Updated 11/23/2021 08:09 AM
Project Title

Dawson Street Drainage Updates

Physical Address View project details and contacts
City, State (County) Thomasville, GA   (Thomas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $337,105
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves upgrading existing storm water drainage system with 79 LF of 18” RCP, 384 LF of 24” RCP, and 414 LF of 30” RCP. Construction includes furnishing of all materials, labor, excavation, installation & backfilling for placement of pipes. Parking lot of IGA & Singletary’s will receive some resurfacing & striping to repair damaged areas from construction. It will improve drainage on Mclean St, Dawson St, and Smith Ave. Smith Ave will be milled & resurfaced 50 ft. each side of the storm drain to adhere to GDOT requirements.

Details

Division 31 - Earthwork, Excavation and Fill, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Base Courses, Asphaltic Base Courses, Flexible Paving, Asphalt Paving.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents