Similar Projects
Roundabout Cooley Mesa Rd/Siena Lake Parkway - Town of Gypsum
Infrastructure
Conception
$1,000,000 CJ est. value
Gypsum, CO 81637

Roundabout Cooley Mesa Rd/Siena Lake Parkway - Town of Gypsum
Infrastructure
Conception
$1,000,000 CJ est. value
Gypsum, CO 81637

2022 Dog Park at Buckhorn Valley
Infrastructure
Design
$180,000 CJ est. value
Gypsum, CO 81637

2022 Dog Park at Buckhorn Valley
Infrastructure
Design
$180,000 CJ est. value
Gypsum, CO 81637

East Park Improvements and North Restrooms, Harry A. Nottingham Park
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Avon, CO 81620

East Park Improvements and North Restrooms, Harry A. Nottingham Park
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Avon, CO 81620

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavilion Structure Upland Park Project
Infrastructure
Post-Bid
Eagle, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Mikaela Way and Town Hall Asphalt Overlay
Infrastructure
Results
Less than $300,000 est. value
Avon, CO

Basalt River Park - Phase I & II
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Basalt, CO 81621

Two Rivers Road Improvements
New Construction
Construction
Basalt, CO 81621

Lionshead Place / Multi-Residential
New Construction, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Vail, CO 81657

435 Eby Creek Apartments
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Eagle, CO 81631

Jules Drive and Highway 6 Roundabout or Traffic Light - Town of Gypsum
Infrastructure
Conception
$2,500,000 CJ est. value
Gypsum, CO 81637

Last Updated 01/23/2023 06:03 PM
Project Title

I-70 Exit - 140 North Roundabout - Town of Gypsum

Physical Address View project details and contacts
City, State (County) Gypsum, CO 81637   (Eagle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 23, 2023, an engineer has been selected and this project is in the final planning phase. It is anticipated bidding will commence in August 2023, with construction starting in September 2023. A detailed scope of work has not been determined.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents