Similar Projects
87th Street Parkway Improvements - Renner Boulevard to Maurer Road - 60108 - City of Lenexa
Infrastructure
Conception
$8,400,000 CJ est. value
Lenexa, KS 66215

87th Street Parkway Improvements - Renner Boulevard to Maurer Road - 60108 - City of Lenexa
Infrastructure
Conception
$8,400,000 CJ est. value
Lenexa, KS 66215

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Concrete Repairs at the County's Pine Street
Infrastructure
Bidding
$500,000 CJ est. value
Newton, KS 67114

Main Street Sidewalk and Lighting Improvement
Infrastructure
Bidding
$3,000,000 CJ est. value
Bucklin, KS 67834

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

14th Street Improvements
Infrastructure
Results
Newton, KS 67114

North Ohio Street from East Belmont Avenue to Woodland Drive and Pedestrian Path Belmont-Ohio-Shryock Park
Infrastructure
Results
Augusta, KS 67010

Chick-Fil-A - Galleria 115 / Overland Park
New Construction, Infrastructure - 4,989 SF
Construction
$1,500,000 CJ est. value
Overland Park, KS 66211

Chick-Fil-A - Galleria 115 / Overland Park
New Construction, Infrastructure - 4,989 SF
Construction
$1,500,000 CJ est. value
Overland Park, KS 66211

The Highlands of Deer Creek
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Overland Park, KS 66213

Highway 81 - City of Concordia
Infrastructure
Pending Verification
$899,157 CJ est. value
Concordia, KS 66901

Reconstruction of the I-135/36th Street Interchange
Infrastructure
Conception
$15,074,608 CJ est. value
Newton, KS 67114

Last Updated 07/12/2023 01:03 AM
Project Title

2023 Playground Modernizations at the 49-02 Site

Physical Address View project details and contacts
City, State (County) Iola, KS 66749   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $425,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Cost Estimate: $400,000-$425,000 The general scope of work includes removal of the playground equipment and surfacing, base preparation, new concrete slabs and walks, new rubber play surfacing and new playground equipment, and other items as specified for a complete and working installation The Contractor agrees that time is of the essence in the completion of the work required by this Contract, for which completion is established on or before Ninety ( 90 ) calendar days, following receipt of the "Notice to Proceed" and Contractor hereby waives any notice putting in default for failure to complete on time. Liquidated Damages. It is agreed that for every calendar day that the contract exceeds Ninety ( 90 ) calendar days, the Contractor will be assessed a deduction against the Contract amount at $100.00 per calendar day, as a liquidated damage fee and not as a penalty. Extensions may be granted by the Authority, as outlined in the General Conditions. a) General Construction i) Please see the attached plans and technical specifications to determine the full scope of work. ii) The general scope includes (1) demolition of the (3) existing playgrounds at these two sites. This includes the equipment, borders and surfacing. (2) Preparation and compaction of the subgrade. (3) Placement of new concrete playground bases at each site. (4) Installation of new playground equipment and play surfacing as selected by the Owner. 2023 CFP Playground Modernizations at the 49-02 Sites, for the Iola H.A. Page 2 of 2 (5) New sidewalks, benches and site improvements as noted (6) Yard repairs, finish grading and seeding of damaged areas in the work zone. iii) The Contractor is responsible for daily cleanup of the work areas, and for hauling these items off for disposal off site. iv) After the original contract has been awarded, additional work may be identified by the Owner and the successful contractor. Additional work will be done by a change order. v) All work shall be completed in compliance with these contract documents vi) Weekly certified payroll reports (CPR's) shall be completed and submitted to the Owner for review. Any questions regarding the RFP should be directed to Richard Zingre, Project Architect at Zingre and Associates, PA. rzingre@gmail.com or 620-223-6030 voice. . The Owner requests that proposals are received by the end of the day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents