Similar Projects
Mountain Bike Trail Construction
Infrastructure
Bidding
$79,200 est. value
Allentown, Schnecksville, PA 18078

2022 ADA Pedestrian Ramp Program
Infrastructure
Post-Bid
Allentown, PA

Lehigh Valley Campus Storm Water Restoration Work
Infrastructure
Post-Bid
$60,000 est. value
Center Valley, PA 18034

Cedar Creek Parkway West - Phase 2 Development Project
Results
Allentown, PA 18104

South Bethlehem Corridor Connections
Results
$200,000 to $499,999 est. value
Bethlehem, PA

Jeter Avenue Street Reconstruction Project
Infrastructure
Post-Bid
$900,000 est. value
Fountain Hill, PA 18015

Coopersburg Streetscape Phase 4
Results
$2,500,000 to $4,999,999 est. value
Coopersburg, PA

2021 Curb and Concrete Contractor
Results
$30,000 to $40,000 est. value
Emmaus, PA 18049

2021 Handicap Ramps, Curb and Sidewalk Improvements
Results
Fullerton, PA 18052

2021 11 Street Overlay and Curb Ramps
Results
$600,000 to $800,000 est. value
Bethlehem, PA

2021 CDBG ADA Pedestrian Ramp Program (Various Locations)
Infrastructure
Results
Allentown, PA

Parkway Manor Elementary School Student Drop-Off Improvements
Infrastructure
Results
Allentown, PA 18104

Parking Lot at N. 7th Street and N. Penn Street
Infrastructure
Results
Allentown, PA 18102

2020 CDBG East Church Street and ADA Improvements
Infrastructure
Results
Slatington, PA 18080

Allentown Jordan Creek Greenway Trail
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
Allentown, PA

Reported 06/02/2022 12:00 AM
Project Title

Pine Street Handicap Ramps Project

Physical Address View project details and contacts
City, State (County) Hokendauqua, PA 18052   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves a single prime contract for installation of five (5) concrete ADA curb ramps and related work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents