Similar Projects
Airplane Painting/Restoration Project
Bidding
Havelock, NC 28532

Repainting Ceiling of Gym - Edgecombe Youth Development Center
Term Contract
Bidding
Rocky Mount, NC 27801

Vacancy Unit Turn at Houston Moore
Post-Bid
Wilmington, NC 28401

Interior Painting of Fire Headquarters
Post-Bid
Wilmington, NC

Painting Restoration Project for Several Schools - Phase II
Results
Fayetteville, NC

Superior 1 Sheetrock Repair and Paint
Results
Beaufort, NC 28516

Paint and Replace Flooring Various Bldgs
Bidding
$500,000 to $1,000,000 est. value
Camp Lejeune, NC 28547

Vacancy Unit Turns/Painting of Vacant and/or Occupied Units Authority Wide
Post-Bid
Wilmington, NC

NCMA FT BRAGG Painting Buildings and 6 Billets
Results
Less than $198,462 est. value
Fort Bragg, NC 28307

Painting Services
Post-Bid
Asheville, NC

Repaint South Nags Head Elevated Tank
Results
Nags Head, NC 27959

RCC Revolving Interior Painting
Term Contract
Post-Bid
Raleigh, NC 27601

Big Buffalo Water Reclamation Facility Influent Pump Station Cleanup
Results
Less than $9,000 est. value
Sanford, NC 27237

Passenger Boarding Bridge Painting
Post-Bid
Charlotte, NC

Paint Concrete Block Walls
Term Contract
Results
Fort Bragg, NC

Last Updated 12/05/2018 09:49 AM
Project Title

Exterior Painting - Guy Smith Stadium

Physical Address View project details and contacts
City, State (County) Greenville, NC   (Pitt County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Provide labor and material for the preparation, repair, and painting of all exterior surfaces of Guy Smith Stadium. Preparation of all surfaces shall be to industry standards. Seal or fill in all cracks with appropriate material at concrete steps, brick walls, or other areas as needed. Repair any damaged concrete with appropriate material before painting. Any damaged or rotten wood shall be replaced before painting. All of the work shall be to industry standards.
Details
Division 09 - Finishes, Painting, Exterior Painting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents