Similar Projects
Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement
Term Contract
Design
Hill AFB, UT

Veterans Park Utility Improvement Project
Infrastructure
Bidding
$159,380 est. value
Sunset, UT

Veterans Park Utility Improvement Project
Infrastructure
Bidding
$159,380 est. value
Sunset, UT

River Bottom Improvement Project Prequalification
Post-Bid

Culinary Water Improvement Project on 300 West Street and 1600 North Street
Post-Bid
$250,920 est. value
Sunset, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

37th Street Reconstruction Project and Culinary Waterline Replacement CDBG Project
Results
South Weber, UT 84403

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Eagleridge Drive Street Overlay Edgewood Drive to Vista View Lane
Infrastructure
Bidding
North Salt Lake, UT 84054

Culinary Water Line Replacements
Post-Bid
$250,000 est. value
Bountiful, UT

Public Works Settling Basins
Results
North Salt Lake, UT 84054

East Chase Lane To Parrish Lane - Culinary Waterline and Storm Drain
Post-Bid
$450,000 est. value
Centerville, UT 84014

Cottonwood Drive Water Line Replacement
Results
Less than $700,000 est. value
South Weber, UT 84405

Construction of the 1200 South Road Project
Post-Bid
Syracuse, UT

1200 South Waterline Project
Results
$150,000 to $200,000 est. value
Syracuse, UT

Reported 02/26/2022 12:00 AM
Project Title

600/640 West Street and Culinary Water Reconstruction Project

Physical Address View project details and contacts
City, State (County) West Bountiful, UT   (Davis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule A work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. The Work generally includes full depth remove and replace of street section between curb, approximately 10,000 square yards of street surface. Project includes installation of 2,500 linear feet of new 8” PVC C-900 Culinary Water Line and abandon existing 6” Cast Iron Culinary Water Line. Schedule B work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. The Work generally includes the construction of asphalt, trail, concrete trail and chainlink fencing along the DSB Canal, connecting to 600 west Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents