Similar Projects
Flowers Chapel Road Widening Phase II - City of Dothan
Infrastructure
Conception
$5,100,000 CJ est. value
Dothan, AL 36305

Flowers Chapel Road Widening Phase II - City of Dothan
Infrastructure
Conception
$5,100,000 CJ est. value
Dothan, AL 36305

Fire Station #10 Construction - City of Dothan
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
Dothan, AL 36301

Al Water System Improvement Project
Infrastructure
Bidding
$3,595,000 CJ est. value
Dothan, AL 36301

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Plaza Drive to Tacoma St. Drainage Improvements Bid
Infrastructure
Post-Bid
$300,000 CJ est. value
Dothan, AL 36301

Baldwin County Resurfacing Projects 2022: Group #2
Infrastructure
Results
Dothan, Fairhope, Foley, Robertsdale, Summerdale, AL 36574

New Building for SARCOA
New Construction, Infrastructure - 12,600 SF
Results
$4,248,000 CJ est. value
Dothan, AL 36305

Candlewood Suites / Dothan
New Construction, Infrastructure - 54,420 SF
Construction
$10,000,000 CJ est. value
Dothan, AL 36301

Candlewood Suites / Dothan
New Construction, Infrastructure - 54,420 SF
Construction
$10,000,000 CJ est. value
Dothan, AL 36301

Dothan Landfill Expansion - City of Dothan
Infrastructure
Pending Verification
$6,200,000 CJ est. value
Dothan, AL 36303

New Animal Shelter Facility - City of Dothan
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Dothan, AL 36305

2021 CDBG Moss Street Paving Project
Infrastructure, Alteration
Post-Bid
Dothan, AL 36301

Jester Street Sidewalks
Infrastructure
Results
$563,116 CJ est. value
Cowarts, AL 36321

Dothan Solar Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Dothan, AL 36301

Last Updated 04/29/2023 05:03 AM
Project Title

Constructing the Resurfacing and Traffic Stripe on Taylor Road From the Junction of SR-605

Physical Address View project details and contacts
City, State (County) Taylor, AL 36305   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,067,804 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For constructing the Resurfacing and Traffic Stripe on Taylor Road from the junction of SR-605 in Taylor to the junction of Homerun Ridge Lane in Dothan (Site 1); on CR-203 (Campbellton Highway) from the Limestone Creek Bridge to the junction of Taylor Road in Dothan (Site 2); and on CR-55 (South Broadway Street) from the South City Limits of Ashford to the junction of SR-12 (US-84) in Ashford (Site 3). Length 7.238 mi. The Bracket Estimate on this project is from $1,718,747 to $2,100,691 . A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $33.00 per set. Contract Time: 30 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 027 - Constructing the Resurfacing and Traffic Stripe on Taylor Road From the Junction of SR-605 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents