Similar Projects
S201--644 | Canteen Hood Cleaning Phoenix VA Health Care System
Term Contract
Design
Phoenix, AZ 85012

S201--644 | Canteen Hood Cleaning Phoenix VA Health Care System
Term Contract
Design
Phoenix, AZ 85012

USDA-ARS-PWA Carl Hayden Bee Research Repair/Replace HVAC/Electrical Components Tucson AZ
Term Contract
Bidding
$500,000 to $1,000,000 est. value
Tucson, AZ 85719

Repair and Renovation of Heating, Ventilation, and Air Conditioning (HVAC System Projects Throughout Marine Corps Air Station (MCAS), Yuma, AZ
Term Contract
Bidding
Yuma, AZ

VA Tucson Replace Air Distribution Systems - Building 57
Post-Bid
Tucson, AZ

Utterback Middle School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85713

HVAC Conversion Project at Tombstone High School and Huachuca City School
Results
$300,000 to $350,000 est. value
Tombstone, AZ 85638

Desert Mesa Chiller Plant Replacement
Results
Yuma, AZ 85365

LDS Encanto Meeting House -- HVAC
Renovation
Construction
$450,000 est. value
Phoenix, AZ 85035

Annual Inspection and Maintenance For Two York YVWA Chillers
Term Contract
Design
Phoenix, AZ 85040

Mount Elden Middle School AHU Replacement - SFB
Post-Bid
Flagstaff, AZ 86004

HVAC Lifecycle Replacement
Results
Fort Huachuca, AZ 85613

HVAC Services
Term Contract
Post-Bid
Window Rock, AZ

Fourth Avenue Junior High School Cooling Tower Replacement
Term Contract
Results
Yuma, AZ 85364

Computer Room Air Conditioner (CRAC) Unit Preventive Maintenance
Post-Bid
Phoenix, AZ 85015

Reported 04/02/2022 12:00 AM
Project Title

Elderly Center Kitchen Range Hood Replacement

Physical Address View project details and contacts
City, State (County) Peach Springs, AZ 86434   (Mohave County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove existing hood, ductwork and roof mounted exhaust fan 2. Assess existing roof curbing for removal and replacement or for repair and re-use as noted in No. 5 below. 3. Description: provide all labor, materials, equipment, and services necessary to furnish and install Type I “Ansul” range hood and ventilation unit, including all ductwork, blowers, fire suppression system, master electric controls and filter sections for a complete and operational system suitable for Therma-Tek Model No. TMD72-36G-6-2, medium duty range (see attached specs). Items not listed but required due to local codes or operational requirements shall be included under base bid. Unit shall be UL listed and labeled. 4. Hood: the hood shall be double shell type, 18 gauge stainless steel inner liner with 18 gauge galvanized outer liner with satin finish stainless steel on the entire outer shell including facing, ends, and slots. Fabrication will be in accordance with NFPA No. 96 requirements and bear the NSF seal and shall be constructed in accordance with the International Building Code. All grease filters shall be AFI rated. 5. Ventilation: the roof mounted ventilation unit including all components shall be fully factory assembled and wired in accordance with the NEC. Heating and filter sections will be one integrated unit, mounted on adjustable supports for post mounting. An insulated steel wall roof curb is part of the furnished system. Master disconnect switches and wiring to the master electric panel will also be included. All duct work will be 16 gauge galvanized welded exhaust, and 18 gauge galvanized supply, conforming to NFPA No. 96. 6. Exterior surfaces of all roof equipment will be weatherproof enamel coated.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents