Similar Projects
Last Updated | 01/23/2023 04:03 PM |
Project Title | RFP Engineering - Perpetuation - Resurfacing C West Allis, W Greenfield Ave |
Physical Address | View project details and contacts |
City, State (County) | West Allis, WI 53214 (Milwaukee County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected August 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 23, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2024. *The closed solicitation has been included below for reference: The pavement needs treatment to extend its service life and curb ramps need to be upgraded. Perpetuation resurfacing project of an urban 4-lane roadway of STH 59 West Greenfield Avenue from 124th Street to 106th Street, approximately 1.1 miles in length, located in the City of West Allis, Milwaukee County. This resurfacing project consists of full depth base patching at various spot locations, milling 4" and overlaying with 4" HMA pavement, inductive loop detectors for all three signal locations are expected to be replaced, box culvert B-40-0371 at Underwood Creek will have south side two wingwalls strapped and have some concrete surface repair. Curb ramps will be upgraded to ADA standards Anticipated Construction Cost: $2,000,000-$2,999,999 Advertised Fixed Fee %: 7.25 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Perpetuation - Resurfacing C West Allis, W Greenfield Ave *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |