Similar Projects
Outdoor Power Circuit Breakers
Term Contract
Sub-Bidding
Columbia, MO 65203

Preventative Maintenance and Repairs for Standby Generators
Term Contract
Post-Bid
Columbia, MO

Preventative Maintenance and Inspection of Electrical Equipment (VA-22-00012932)
Term Contract
Post-Bid
Columbia, MO 65201

PMU-6M Switchgears
Term Contract
Results
Columbia, MO

Outdoor Power Circuit Breakers
Alteration
Results
Columbia, MO

Underground Electrical Distribution Materials
Term Contract
Post-Bid
Columbia, MO

Oil Switches
Alteration
Results
Columbia, MO

Overhead Electrical Distribution Materials
Term Contract
Post-Bid
Columbia, MO

Three Phase Pad Mounted Transformers
Term Contract
Results
Columbia, MO

Distribution Transformers
Term Contract
Post-Bid
Columbia, MO 65201

University of Missouri Teaching Hospital - 480 Volt Equipment Power Distribution to Penthouse
Alteration
Results
Columbia, MO

Electric Operations Vegetation Management Services
Term Contract
Post-Bid
Columbia, MO 65201

Hickman High Theatre Lighting Upgrade
Alteration
Results
Columbia, MO 65203

Wood Utility Poles
Alteration
Post-Bid
Columbia, MO

Rebuilt or Reconditioned Single Phase Distribution Transformers
Alteration
Results
Columbia, MO

Last Updated 01/25/2023 11:03 PM
Project Title

Hulston Hall - Replace Fire Alarm System

Physical Address View project details and contacts
City, State (County) Columbia, MO 65201   (Boone County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $272,750 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Information regarding bid results will be available the day following the bid opening by calling (573) 882-1133 A Diversity Participation goal of 10% Combined MBE, WBE, DBE, Veteran Owned Business and 3% SDVE has been established for this contract. The Owner reserves the right to waive informalities in bids and to reject any and all bids. Individuals with special needs as addressed by the Americans with Disabilities Act may contact (573) 882- 1133. Questions regarding the scope of work should be directed to Mark Jones with SSC Engineering at (636) 530- 7770 or mjones@sscengineering.com. Questions regarding commercial conditions should be directed to Scott Smith at (573) 882-9217 or smithws@missouri.edu. The Owner reserves the right to waive informalities in bids and to reject any and all bids. Individuals with special needs as addressed by the Americans with Disabilities Act may contact (573) 882- 1133 SCOPE OF WORK a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Project consists of replacing the existing fire alarm system in its entirety. The existing system is a horn/strobe system and will be replaced with an Emergency Voice/Alarm Communication (EVAC) system. (2) Demolition shall consist of removing existing horn, horn strobes, strobes, duct detectors, smoke detectors, heat detectors, control and monitor modules, fire alarm power supplies, fire alarm control panel, wiring and all other appurtenances. (3) Provide and install new speakers, speaker/strobes, strobes, duct detectors, smoke detectors, heat detectors, control and monitor modules, fire alarm power supplies, fire alarm control panel, wiring and all other appurtenances for a complete system. (4) Electrical work shall consist of new wiring from existing panelboards to new fire alarm power supplies and reconnection to new fire alarm control panel. 4. LOCATION Work shall be performed under this Contract on campus of the University of Missouri - Columbia, at Hulston Hall located at the corner of Conley Ave. and Missouri Ave. CONSTRUCTION ESTIMATE: $300,265-$333,628 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents