Similar Projects
Reported | 07/03/2020 12:00 AM |
Project Title | 5410--Hazmat Storage Unit |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA 19104 (Philadelphia County) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Philadelphia VA Medical Center in Pennsylvania is seeking information on potential sources to provide and install a hazmat storage building that has the following salient characteristics listed below. Potential vendors should respond with their ability to provide the following storage building with specifications described below. Product Name: Hazmat Storage Building The specific characteristics to meet the Government needs include the following: Maximum Dimensions Exterior: 20 x 10 x 8 (minimum internal height of 7 6 ) Storage Capacity. Up to 27 Drums 100-110 Total Sq. Ft Sump Capacity: 400+- Gallons Snow Load: 40 PSF Floor Load: 500 PSF Wind Load: 130 MPH Exposure C, Building Weight: max 19,000 lbs. 4-hour fire rated construction that meets or exceeds UL 263 & ASTM E-11 9. Fire-Rated Class A flame spread, wind uplift exceeds UL Rating 1·60 and constructed of weatherproof noncombustible construction. Climate-controlled (heat/air), fully weatherproof. Must comply with all applicable federal, state, and local standards for personnel safety and the storage of hazardous liquids/solids i.e. OSHA/NFPA/DOT standards and regulations. Must be constructed to accommodate forklift pockets and tie-down brackets for offloading with an appropriately sized crane. Frame capable of withstanding at least 1000 lbs. psf. Lifting capability. Double door, self-closing but capable of being held open with fusible linkage on long side of unit, lockable, weatherproof, mid-section of unit. Must have a minimum Internal pressure of 217 pounds per square foot with two (2) pressure-relief panels located on the exterior wall which will release if the internal pressure (due to fire or excess heat conditions) exceeds 20 lbs. psf. Factory Mutual approval release fasteners and a restraint mechanism designed to cushion the panel's acceleration as the full open position is reached. Meets FM 6049. The unit should be provided with either level ground level entry or ramp to accommodate roller entry of large drums. Ramp must not exceed 1:10 slope. Exterior color should be red or yellow consistent with high visibility requirements. Other colorations may be acceptable provided item 13 is complied with. Appropriate signage, postings, labeling on all four exterior sides to meet DOT and NFPA standards for labeling and posting of hazard and warning signage. Sump area must be able to accommodate at least 50% spillage of maximum combined internal liquid storage. Sump area must accommodate connections for draft removal of any spilled liquids. Floor of unit will be of open grate, metal construction to allow for full capture of any spilled liquid. Must meet OSHA standards for walking surfaces. Standard Electrical Load shall be a UL Listed, Single-Phase, 3 Wire, 12D/240V 100-A Load Center. Electrical equipment shall be capable or operation on 240 VAC- single phase - 60 Hz. All power components shall be sized to carry current at 230 Volts. Rainproof and Sleet- (Ice-) Resistant-Outdoor enclosures for outdoor access to protect the equipment from inclement weather to include rain, sleet, ice, snow and meet the requirements of Underwriters' Laboratories, Inc., Publication No. UL 508, applying to 'Rainproof Enclosures. Electrical equipment shall be in accordance with NFPA and NEC standards and internal electrical equipment accessories, conduit must be explosion proof. Unit must have one (1) exterior grounding connection, one 10·foot long 5/8" diameter copper-clad steel grounding rod, copper conductor, and grounding lugs. Ventilation for the storage unit must be provided via non-sparking electric exhaust or mechanical exhaust ventilation system(s). Gravity Air Flow Ventilation shall be UL-listed with 3-hour-fire rated dampers 165-degree fusible links. Dampers Include louvers and screens to provide airflow and have a galvanized steel frame and curtain type galvanized steel blades. Location of the ventilation must be arranged to provide air movement across all areas of the floor to prevent accumulation and shall be directed to the atmosphere, not recirculated Into compartment at a minimum, one cubic foot per minute (CFM to allow for a minimum of at least 6 air changes per hour. Located preferably on the end unit opposite the fire protection and electrical circuit boxes. Fire protection. The unit will include one (1) dry chemical fire protection system. The operational unit (fire box) will be located on the exterior of the HSWU and capable of being secured (locked). All internal piping, fusible links and nozzles will comply with NFPA standards. The system may be capable of being connected to the VA fire alarm system but may also be stand alone with external fire system audio/visual alarm located on at least two (2) sides of the unit. Contractor will be responsible for offloading and moving the storage building including installation to a defined location within the premises. |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |