Last Updated | 06/02/2022 05:49 AM |
Project Title | Peabody-Walters Relief Sewer Phase 1B |
Physical Address | View project details and contacts |
City, State (County) | Fairfield, CA (Solano County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,401,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Peabody-Walters Relief Sewer Phase 1B includes, but is not limited to, construction of approximately 1/2 mile of new 21-inch vitrified clay sewer main pipe along Huntington Drive and Peabody Road in Fairfield via open-cut trenching. The project requires a new 36-inch diameter bored and jacked steel casing under an existing railroad spur track using a special vitrified clay jacking type carrier pipe with flush no-bell stainless steel gasketed couplers. The project also includes potholing, utility coordination, dewatering, trench bedding and backfill, trench repaving (temporary and permanent patches), a sewer crossing under fuel line, monument protection, public notifications, traffic control and construction area signs, night work where required, traffic signal detector loop replacement, sewage bypass systems, sewer tie-ins at manholes, and all other work necessary to complete the WORK as indicated in the Contract Documents. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |