Similar Projects
City-Maintained Catch Basins Full Capture Systems Retrofit Project
Infrastructure
Bidding
$100,000 est. value
Laguna Woods, CA

Sanitary Sewer Repairs FY 2021-2022 Package III
Infrastructure
Bidding
$855,536 est. value
San Jose, CA

River Trunk Realignment Gravity System Project
Infrastructure
Post-Bid
$24,970,000 est. value
Modesto, CA

As-Needed Sewer Cleaning and Inspection (Fy22)
Infrastructure
Post-Bid
$1,400,000 est. value
San Francisco, CA

CIPP Fiberglass Pipe Lining
Infrastructure
Results
Sacramento, CA

Cast Iron Sewer Replacement FY 2020-2021 Package IV
Infrastructure
Results
$716,790 est. value
San Jose, CA

Calle Fortuna Manhole Improvements
Alteration
Bidding
$200,000 est. value
Dana Point, CA

Lake Mendocino (CVD) Septic Service
Alteration
Post-Bid
Ukiah, CA 95482

Sanitary Sewer Rehabilitation (Sub-Basin 85-202)
Alteration
Results
$5,900,000 est. value
Oakland, CA

Island Annexation 478 B and C Sewer Project
Infrastructure
Bidding
$2,634,511 est. value
Porterville, CA

On Call Service Contract for Water and Sewer Utility Repairs
Term Contract
Post-Bid
Santa Clara, CA

Richmond Residential Streets Pavement Renovation and Sewer Replacement
Infrastructure
Results
$7,300,000 est. value
San Francisco, CA

Sanitary Sewer Repairs FY 2021-2022 Package II
Infrastructure
Bidding
$778,316 est. value
San Jose, CA

Alleys N/O Hadley Between Pickering And Friends Sewer Main Replacement Project
Infrastructure
Post-Bid
$4,100,000 est. value
Whittier, CA 90603

PW Transit As-Needed Contract No. 2
Infrastructure, Alteration
Results
$3,000,000 est. value
San Francisco, CA

Last Updated 06/02/2022 05:49 AM
Project Title

Peabody-Walters Relief Sewer Phase 1B

Physical Address View project details and contacts
City, State (County) Fairfield, CA   (Solano County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,401,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Peabody-Walters Relief Sewer Phase 1B includes, but is not limited to, construction of approximately 1/2 mile of new 21-inch vitrified clay sewer main pipe along Huntington Drive and Peabody Road in Fairfield via open-cut trenching. The project requires a new 36-inch diameter bored and jacked steel casing under an existing railroad spur track using a special vitrified clay jacking type carrier pipe with flush no-bell stainless steel gasketed couplers. The project also includes potholing, utility coordination, dewatering, trench bedding and backfill, trench repaving (temporary and permanent patches), a sewer crossing under fuel line, monument protection, public notifications, traffic control and construction area signs, night work where required, traffic signal detector loop replacement, sewage bypass systems, sewer tie-ins at manholes, and all other work necessary to complete the WORK as indicated in the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents