Similar Projects
Commons Building HVAC - Wake County
Renovation, Alteration
Conception
$325,000 est. value
Raleigh, NC 27610

Jordan Hall HVAC Renovation
Alteration
Bidding
$700,000 est. value
Raleigh, NC 27695

Police Headquarters HVAC Replacement
Post-Bid
Raleigh, NC

HVAC Upgrades to Thomas Hall
Post-Bid
Less than $500,000 est. value
Raleigh, NC 27607

DPS - Morrison Aggrey Dorm Heating System Replacement
Results
Raleigh, NC 27699

Rooftop Air Handlers Replacement
Results
$362,139 est. value
Raleigh, NC 27604

Police Department Headquarters HVAC Replacement
Post-Bid
Raleigh, NC 27615

Construction of HVAC and Electrical Renovations for Rock Quarry Road Auxiliary Services
Results
Raleigh, NC 27610

Air Cooled Chillers Building Automation Lab
Post-Bid
Raleigh, NC

Brooks Hall Matsumoto Wing HVAC Renovation
Renovation
Results
Less than $565,616 est. value
Raleigh, NC

Chiller Installation and Repair
Term Contract
Post-Bid
Raleigh, NC

Central Operations Facility - Cooling Tower Platform
Results
Raleigh, NC

HVAC Installation and Repair
Post-Bid
Raleigh, NC

The Marbles Kids Museum Imax Theater Chillers Replacement
Results
Raleigh, NC 27601

Replace Air Cooled Chiller
Alteration
Post-Bid
Raleigh, NC

Last Updated 07/07/2022 03:39 PM
Project Title

HVAC Installation and Repair Service

Physical Address View project details and contacts
City, State (County) NC   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Chiller Installation/Repair (JOC) - Contractor must carry appropriate licenses and/or certifications. Contractor shall have adequate and qualified staff in order to provide WCPSS with the service and/or response time requested. Must be able to handle multiple calls at one time, respond on a 24 hour, 7 day basis and will be expected to respond to emergency requests within 2 hours. Scope of work includes installation, maintenance and repair of chillers of all manufacturers at all sites. Contractor must be knowledgeable of mechanical/electrical schematics and be able to trouble shoot problems relating to these systems. Contractor will have procedures in place for working on mechanical/electrical systems and employee training will be kept up to date as per contractors requirements. Contractor will utilize a Lockout/Tagout procedure when working on these systems. Contractor responsible for any required permitting in order to perform job .task

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents