Similar Projects
New Stem Research Center
Post-Bid
$198,000,000 est. value
Storrs, CT 06269

Uconn Gant Building Renovations at Stem Phase 2
Renovation
Post-Bid
Less than $1,379,067 est. value
CT

Public Safety Building Improvements
Addition - 3,500 SF
Results
Storrs, CT 06268

Horse Unit I and II Lorentzon Stables Upgrade
Results
Less than $188,250 est. value
Storrs, CT 06269

Modular Clean Room
Post-Bid
Storrs, CT 06269

Hicks and Grange Student Room Renovations
Renovation
Results
$1,000,000 est. value
Storrs, CT 06269

Torrey Life Science MCB Lab Renovations
Renovation
Post-Bid
Storrs, CT 06269

North Campus Residence Hall Renovations Phase II
Renovation
Results
Storrs, CT 06269

On-Call General Contractor Services Set-Aside Program for Projects Estimated at Under $100,000
Post-Bid
Storrs, CT 06269

North Dining Dish Room Renovation
Renovation
Results
Storrs, CT 06269

Trade Labor Contractor for Academic Renovations
Renovation
Results
Storrs, CT

Kirby Mills First Floor Renovation
Renovation
Results
Mansfield, CT

West Campus Dorms Mechanical Room Repairs
Results
Storrs, CT

UCFM Code Remediation Hall Building
Results
Less than $100,000 est. value
Storrs, CT

Student Union Office Renovations
- 1,000 SF
Results
$100,000 to $500,000 est. value
Storrs, CT 06269

Last Updated 02/24/2021 08:42 AM
Project Title

Longley Hall Bathroom Renovation

Physical Address View project details and contacts
City, State (County) Mansfield, Storrs, CT 06268   (Tolland County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Update/repair 1st floor 1950's bathrooms. Create 2nd floor bathroom. The project shall consist of the renovation to two existing restrooms on the first floor, and construction of two new restrooms on the second floor of Longley Hall at University of Connecticut, Storrs campus. The renovation of the first floor restrooms are to include, but not be limited to, new plumbing fixtures, new floor & wall finishes, new restroom accessories, new toilet partitions, some new ceilings, new exhaust fans, and partial renovation to the existing mechanical system. New restrooms on the second floor are to be constructed of gypsum board finish on metal stud framing, with all new finishes and fixtures throughout.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents