Similar Projects
Ayer Street Water Line- City of Barre
Infrastructure
Conception
$510,000 CJ est. value
Barre, VT 05641

Brook Street Water Line - City of Barre
Infrastructure
Conception
$240,000 CJ est. value
Barre, VT 05641

Granite Shed Lane Development
New Construction, Infrastructure - 6,000 SF
Design
$1,200,000 CJ est. value
Montpelier, VT 05602

Copley Mansfield Orthopaedics Medical Office
New Construction, Infrastructure - 9,990 SF
Design
$5,800,000 CJ est. value
Waterbury, VT 05676

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Crafco Pavement Repair, Equipment, Supplies, Parts, and Repair Services
Infrastructure
Post-Bid
Montpelier, VT

Statewide - Northeast Region Stpg Mark(317)
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Statewide - Northeast Region Stpg Mark(318)
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Spruce Place
New Construction - 27,122 SF
Construction
$2,493,540 est. value
Berlin, VT

Yestermorrow Dormitory 1
New Construction - 1,250 SF
Construction
$70,000 est. value
Waitsfield, VT 05673

Vermont Foodbank
Addition, Demolition, Renovation, Infrastructure - 5,626 SF
Pending Verification
$607,608 CJ est. value
Barre, VT 05641

Barre Road Industrial Building
New Construction, Infrastructure - 4,200 SF
Pending Verification
$500,000 CJ est. value
Barre, VT 05641

Hill Street Water Line (Upper) - City of Barre
Infrastructure
Conception
$220,000 CJ est. value
Barre, VT 05641

Norwich University / Multi-Disciplinary Cyber Fusion Research and Development Center
New Construction, Infrastructure
Design
$16,400,000 CJ est. value
Northfield, VT 05663

Boardwalk Construction
Addition, Infrastructure
Post-Bid
$100,000 est. value

Last Updated 05/12/2023 04:35 PM
Project Title

Wrightsville Dam Spillway Maintenance

Physical Address View project details and contacts
City, State (County) Montpelier, VT 05602   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of, but is not limited to: The Wrightsville Dam located in Montpelier VT, is owned and operated by the State of Vermont, Department of Environmental Conservation. The dam was originally constructed back in the 1930s to serve the purposes of flood control, and recreation. The US Army Corps of Engineers are the original dam designer. Today the dam is still actively used for flood control, recreation, and power generation. The dam includes an approximately 160 feet wide by 900 feet long auxiliary spillway discharge channel located at the eastern abutment. The auxiliary spillway is controlled by a concrete ogee crested weir which spans across the channel. The eastern side of the channel is bordered by a vertical rock cut approximately 46 feet tall, and the western side of the auxiliary spillway channel is bordered by a reinforced concrete training wall approximately 36 feet tall. The VT DEC Dam Safety Program has designed a maintenance project to clean up and maintain the auxiliary spillway, along with some of its appurtenant features. Main Project Elements 1.) Auxiliary Spillway Rock Cut Maintenance (Hazard Tree and Rock Removal), Rock Removal Through Hand/Machine Techniques (no explosives) 2.) Auxiliary Spillway Approach Channel Culvert Replacement and Re-Grading, Traffic Control 3.) Paint & Re-Seal Auxiliary Spillway Training Wall and Concrete Surfaces 4.) Install Signage Along Auxiliary Spillway & Rock Cut Access Road 5.) Install Gate at Base of Rock Cut Access Road, Clean Up Debris & Trash Along Rock Cut Access Road Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $145.00

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents