Similar Projects
Last Updated | 05/12/2023 04:35 PM |
Project Title | Wrightsville Dam Spillway Maintenance |
Physical Address | View project details and contacts |
City, State (County) | Montpelier, VT 05602 (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,200,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of, but is not limited to: The Wrightsville Dam located in Montpelier VT, is owned and operated by the State of Vermont, Department of Environmental Conservation. The dam was originally constructed back in the 1930s to serve the purposes of flood control, and recreation. The US Army Corps of Engineers are the original dam designer. Today the dam is still actively used for flood control, recreation, and power generation. The dam includes an approximately 160 feet wide by 900 feet long auxiliary spillway discharge channel located at the eastern abutment. The auxiliary spillway is controlled by a concrete ogee crested weir which spans across the channel. The eastern side of the channel is bordered by a vertical rock cut approximately 46 feet tall, and the western side of the auxiliary spillway channel is bordered by a reinforced concrete training wall approximately 36 feet tall. The VT DEC Dam Safety Program has designed a maintenance project to clean up and maintain the auxiliary spillway, along with some of its appurtenant features. Main Project Elements 1.) Auxiliary Spillway Rock Cut Maintenance (Hazard Tree and Rock Removal), Rock Removal Through Hand/Machine Techniques (no explosives) 2.) Auxiliary Spillway Approach Channel Culvert Replacement and Re-Grading, Traffic Control 3.) Paint & Re-Seal Auxiliary Spillway Training Wall and Concrete Surfaces 4.) Install Signage Along Auxiliary Spillway & Rock Cut Access Road 5.) Install Gate at Base of Rock Cut Access Road, Clean Up Debris & Trash Along Rock Cut Access Road Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $145.00 |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |