Similar Projects
Performing Arts Annex, Gymnasium & Athletic Turf Field
New Construction
Conception
$30,000,000 est. value
Chicago, IL 60618

Arlington Park Redevelopment
Renovation
Conception
Arlington Heights, IL 60005

Jaycee Park Tennis & Basketball Courts
Infrastructure
Design
Park Ridge, IL

Replacement of Playground Equipment
Renovation
Bidding
Hoffman Estates, IL

Maine South HS Track Replacement
Renovation
Bidding
Park Ridge, IL 60068

Chestnut Avenue Improvements
Post-Bid
Glenview, IL 60026

AIDS Garden Lincoln Park
Post-Bid
Chicago, IL 60657

Infield Renovation
Results
Orland Park, IL 60462

Demolition, Concrete and Masonry Improvements at the Veterans Park
Results
South Holland, IL 60473

Ice Arena Addition
Addition
Construction
Mount Prospect, IL

North Milwaukee Mixed Use Development
Renovation - 125,000 SF
Pending Verification
Chicago, IL 60641

West Garfield Park Outdoor Roller Rink & Community Plaza
New Construction
Pending Verification
$1,500,000 est. value
Chicago, IL 60624

The Ave Redevelopment
New Construction, Renovation - 21,000 SF
Conception
$25,300,000 est. value
Chicago, IL 60651

CPS Ogden ES - Rudolph ES
Renovation, Infrastructure
Bidding
Chicago, IL 60610

Robert Crown Ice Rink Refrigeration Maintenance
Term Contract
Post-Bid
Less than $45,000 est. value
Evanston, IL 60202

Reported 02/03/2022 12:00 AM
Project Title

Gompers Park Fieldhouse Repairs & Upgrades

Physical Address View project details and contacts
City, State (County) Chicago, IL 60630   (Cook County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Park/Playground
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected February 2022, Construction Completion Expected December 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

New roof, gutters, downspouts, door and window repair, and masonry repair. Site work includes ADA upgrades to the main entrance, an accessible parking space with an accessible route to the main entrance, an accessible route from the locker rooms on the lower lever to the parking lot. Interior upgrades include a renovation to the lower-level locker rooms, creating accessible toilet rooms on the main floor and minor electrical upgrades.

Details

Athletic Facility, Renovation, Park/Playground, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents