Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

The Spargo at Oxford Commons
New Construction, Infrastructure - 25,000 SF
Design
$6,000,000 CJ est. value
Oxford, MS 38655

Water Systems Improvement Project
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Ocean Springs, MS

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

OCEDA NorthStar Industrial Park Building Pad - Mass Grading
Infrastructure
Post-Bid
Starkville, MS

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

Long Beach Wastewater System Upgrade Phase 1
Results
Gulfport, MS

Southeast Greene Water Authority - Water Main Project
Alteration
Construction
$900,262 est. value
Lucedale, MS

MS Highway 18 Utility Relocation
Infrastructure
Construction
Utica, MS 39175

Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Taylorsville Water Mains
Infrastructure
Post-Bid
Taylorsville, MS

Graveline Road Utility Relocation Project
Results
$340,098 est. value
Pascagoula, MS 39567

General Aviation Area Water System Improvements
Infrastructure
Post-Bid
Columbus, MS 39701

City of Indianola Utility Relocation
Results
Indianola, MS

Gateway Industrial Park Water System
Infrastructure
Post-Bid
MS

Last Updated 11/04/2022 01:35 PM
Project Title

Tuscan Sewer Project - City of Hattiesburg

Physical Address View project details and contacts
City, State (County) Hattiesburg, MS 39401   (Forrest County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Tuscan Sewer Project A detailed scope is not available. As of November 4, 2022, this project is in preliminary engineering. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents