Similar Projects
Coes-Binienda Beach Improvements/DPWP
New Construction
Results
$1,000,000 est. value
Worcester, MA 01603

White Pond Beach Area Improvements - Phase 1
Renovation
Results
$1,200,000 est. value
Concord, MA

Shannon Beach Restroom Facilities - General Bids
Renovation
Bidding
$2,050,694 est. value
Winchester, MA 01890

A Marine Contractor to Repair/Replace 22 Structural Piles, Misc Pile Caps and Stringers on the Oak Bluffs Pier
Results
Less than $550,000 est. value
Falmouth, MA 02540

Railroad Street Redevelopment
New Construction - 19,266 SF
Design
Haverhill, MA 01835

Dockwa
Conception
$14,200,000 est. value
Cambridge, MA

Memorial Beach Improvements
Results
Less than $460,000 est. value
Webster, MA 01570

Construction of the Nantucket Harbormaster Building - General Bid
New Construction, Demolition
Post-Bid
$3,000,000 est. value
Nantucket, MA 02554

Onota Lake Beach Improvements
Results
Less than $50,000 est. value
Pittsfield, MA 01201

Construction of the Nantucket Harbormaster Building - Filed Sub-Bid
New Construction, Demolition
Results
$3,000,000 est. value
Nabnasset, MA

Horseneck Beach State Campground Improvements Sitework and Ecological Improvements
Results
$3,000,000 est. value
Westport, MA 02790

Reported 02/17/2022 03:33 PM
Project Title

MIT Pierce Boathouse

Physical Address View project details and contacts
City, State (County) Cambridge, MA 02139   (Middlesex County)
Category(s) Entertainment/Recreation
Sub-Category(s) Beach Facility/Marina
Contracting Method
Project Status Building in Operation as of fourth quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interior renovation and exterior updates to the building siding. An additional means of egress has been added on the west side of the existing building to provide emergency egress from the building. The floating pile-supported docks on the west side of the boathouse building will be expanded in area to meet the demand for more boats and rowers using the facility and needed access to the Charles River. Additional small floating docks tied up to the north, west and south sides of the boathouse building have been added to provide additional dockage for crew boats and community boats.

Details

Beach Facility/Marina, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents