Similar Projects
Comstock Hall Renovation
Renovation
Conception
Ithaca, NY 14853

Schurman Hall - Phase 1
Renovation - 4,000 SF
Conception
$1,700,000 est. value
Ithaca, NY 14853

Improvements for Academic Support Units
Renovation
Bidding by Invitation
$5,000,000 to $5,400,000 est. value
Ithaca, NY 14850

Snee Hall Mass Spectrometer Installation Ventilation
Renovation
Post-Bid
$1 to $100,000 est. value
Ithaca, NY 14853

Replace Roofs - Multiple Clinical Program Buildings
Renovation - 28,000 SF
Results
$1,300,000 est. value
Ithaca, NY 14853

Weill Hall Domestic Hot Water Heater Replacement
Renovation
Results
$250,000 to $275,000 est. value
Ithaca, NY 14853

Phi Gamma Delta (118 McGraw Place) The Oaks 21 Renovations - Project 1
Renovation
Construction
$485,000 to $500,000 est. value
Ithaca, NY 14850

Rhodes Hall First Floor Block Renovations
Renovation - 11,124 SF
Construction
$1,500,000 to $2,000,000 est. value
Ithaca, NY 14853

Abate & Renovate Walk-In Coolers Pomology Cold Storage Building
Renovation
Conception
Ithaca, NY 14853

Phase 5 Low Rise 6 Interior Modifications
Renovation
Results
$200,000 to $300,000 est. value
Ithaca, NY 14853

North Campus Utility Improvements - Electrical Loop and CIT Ductbank
Renovation
Construction
$4,150,000 est. value
Ithaca, NY 14853

Building 1035 Lab & Greenhouse Decontamination & Demolition
Renovation
Results
$400,000 to $420,000 est. value
Ithaca, NY 14853

Duffield Hall Exterior Plaza Wall and Paver Stone Replacement
Renovation
Construction
$496,800 est. value
Ithaca, NY 14853

Environmental Health & Safety Roof Replacement
Renovation
Results
$450,000 to $500,000 est. value
Ithaca, NY 14853

Uris Library Addition Study Area
Renovation
Construction
$950,000 to $1,050,000 est. value
Ithaca, NY 14853

Reported 11/28/2018 08:26 AM
Project Title

East Hill Plaza Training Room Relocation and Office of Sponsored Programs (OSP) Renovation

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14850   (Tompkins County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced November 2018, Construction Complete as of April 2019
Bids Due View project details and contacts
Estimated Value $325,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Demolition of non-load bearing metal stud walls and architectural finishes, associated mechanical and electrical systems and equipment within the rooms, abatement and necessary requirements of hazardous material. Add four private offices, the modify conference room and reception area, convert storage room to training room and corridor, relocate training room furniture and new office systems furniture (furniture is NIC). The new hard walled offices will be 3 5/8 inch metal studs with 5/8 gypsum wall board each side with acoustic batt insulation in the stud cavity and acoustic sealant above and at the base of the wall. The four offices will require Cornell approved finishes and hardware for the doors and mechanical, electrical, fire protection and data reconfigurations as impacted. 3. The entire area of works open and private offices, as well as will receive new carpet tile and rubber base, except at entryway of the training room and division of financial affairs and entryway, kitchenette and corridor of office of Sponsored Programs which receive vinyl tile and rubber base, modify power, lighting fixture, lighting controls and voice and data throughout the renovated spaces. New receptacles will be installed flush mounted in the new private office framed walls, where indicated on the drawings. All new receptacles will be mounted 18 above finish floor, except in the kitchenette where new cabinetry would interfere.
Details College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents