Similar Projects
Heating System Repair and Replacements
Renovation
Design
$2,000,000 CJ est. value
Hartford, WI 53027

Pickle Pond Remedial and Habitat Design Project
Infrastructure
Bidding
$200,000 CJ est. value
Superior, WI 54880

Waterfront Buildings Asbestos Abatement Project
Term Contract, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Baileys Harbor, WI 54202

Razing of Commercial Structures
Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Sheboygan, WI 53081

Water Quality Monitoring Upgrades
Post-Bid
Milwaukee, WI 53225

Asbestos, Lead-Based Paint And Hazardous Materials
Renovation
Post-Bid
Milwaukee, WI 53224

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

West HS Abatement/Demolition
Results
Madison, WI 53726

Dormitory Abatement and Demolition
Term Contract, Demolition, Infrastructure
Construction
$1,138,000 CJ est. value
Eau Claire, WI 54701

Convert Vehicle Storage Bays to Heated Workspace
Renovation
Construction
$112,090 CJ est. value
Delafield, WI 53018

Redevelopment Area #2 Asbestos Removal, A CDBG-PF and CDBG-CLOSE
Term Contract, Infrastructure
Sub-Bidding
$25,000 CJ est. value
Algoma, WI 54201

Groundwater Sampling Services
Term Contract
Post-Bid
Ashippun, WI 53003

Le Phillips Memorial Library - Hazardous Material Abatement
Results
Eau Claire, WI 54701

Mold Remediation
Term Contract
Post-Bid
Milwaukee, WI

2021 Time & Material Parks Facilities
Term Contract
Results
Milwaukee, WI

Last Updated 09/12/2022 02:15 PM
Project Title

Upgrade Toilet Shower Buildings at Ottawa Lake

Physical Address View project details and contacts
City, State (County) Ottawa, WI 53118   (Waukesha County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade Toilet Shower Buildings at Ottawa Lake All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014 In general the work consists of: Remodeling of three bath houses: Bath house building 1; construct three new shower rooms in existing structure, modify existing utility room, install new toilet partitions. Bath house building 2; install new toilet partitions. Bath house building 3; install new toilet partitions, shower controls and water closets. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents