Similar Projects
Stormwater Reduction in the Town of Brandon (Neshobe River Watershed)
Bidding
$44,000 est. value
Brandon, VT

Wastewater System Upgrade - Request for Statement of Qualifications for Engineering Services
Post-Bid
Bolton Valley, VT 05477

Mountainside Condominiums Drainage Improvements
Renovation
Post-Bid
Warren, VT 05674

Northwest Neighborhood Sewer Separation - Phase 1A
Results
$2,000,000 est. value
Rutland, VT 05702

2020 Hickok Street and West Lane Sewer and Storm CCTV
Results
Winooski, VT 05404

GSI/CSO - South End Retrofits
Post-Bid

TAP16(5) Detention Pond Retrofit
Results
$300,000 to $500,000 est. value
Essex, VT

GSI/CSO: South End Retrofits
Post-Bid
Burlington, VT

Orchard Street and Water Tower Road Sewer and Stormwater Improvements
Results
$151,633 est. value
Enosburg Falls, VT

Berlin Town Offices and Garage Stormwater Improvements
Results
$50,000 est. value
Berlin, VT 05602

Oak and Buzzell Street, Sewer and Storm Improvements
Results
Saint Johnsbury, VT

10 Lincoln Street Stormwater Improvements
Results
$42,000 est. value
Springfield, VT 05156

Reported 03/06/2021 12:00 AM
Project Title

Stormwater Maintenance Program Pipe Lining 2021

Physical Address View project details and contacts
City, State (County) Colchester, VT   (Chittenden County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pipe lining of 8 stormwater pipe segments at various locations around Town. The scope of work includes pipe lining for 880 linear feet (LF) of 12” corrugated metal pipe (CMP) and 58 LF of 15” CMP. A 213 LF 18” CMP is included in the scope of work, as well. We believe a spot repair may be adequate to address the 18” pipe, but are also asking for the full lining cost for this pipe segment separately in the event that action is determined to be necessary. Work includes not only the installation of the pipe lining, but also cleaning, repairing and preparing the existing pipe prior to CIPP installation; bypass pumping of flow, if necessary; traffic control; performing required materials sampling and testing; performing video inspection of the completed lining; cleanup of the project area; and furnishing all labor, tools, equipment, and incidentals necessary to complete the work

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents