Similar Projects
US 11 - Utilities
Infrastructure
Conception
$1,000,000 CJ est. value
Ponca City, OK 74601

Bridge and Approaches - SH 156
Infrastructure
Design
$2,000,000 CJ est. value
Ponca City, OK 74601

Bridge and Approaches - SH 156
Infrastructure
Design
$2,000,000 CJ est. value
Ponca City, OK 74601

Kaw Lake Wildlife Management Area (WMA) Gun Range
Infrastructure, Renovation
Bidding
$563,000 CJ est. value
Kaw City, OK 74641

Kaw Lake Wildlife Management Area (WMA) Gun Range
Infrastructure, Renovation
Bidding
$563,000 CJ est. value
Kaw City, OK 74641

Classroom Addition at Concert Hall
Addition, Demolition, Infrastructure - 110,711 SF
Sub-Bidding
$6,000,000 CJ est. value
Ponca City, OK 74601

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Tonkawa Street Improvements to Various Streets
Infrastructure
Post-Bid
$370,000 est. value
Tonkawa, OK

6th Street – Fresno Ave to Hartford Ave
Infrastructure
Results
Ponca City, OK

Resurface (Asphalt) I-35
Infrastructure
Results
OK

Utilities - US 60
Infrastructure
Design
$1,000,000 CJ est. value
Ponca City, OK 74601

RFQ Construction Manager at Risk (CMAR) - Construction Manager At Risk (CMAR) Tonkawa Tribal Cultural Center
New Construction, Infrastructure - 12,100 SF
Bidding
$1,000,000 CJ est. value
Tonkawa, OK 74653

Drainage Improvements Project Joe Street, Phases 1 and 2
Infrastructure
Post-Bid
$300,000 CJ est. value
Ponca City, OK 74601

Road Construction OTOE Missouria
New Construction
Results
$1,000,000 to $5,000,000 est. value
Ponca City, Red Rock, OK 74651

Bridge Rehabilitation - US 60
Infrastructure
Design
$3,759,812 CJ est. value
Ponca City, OK 74601

Last Updated 11/30/2022 03:24 PM
Project Title

Walnut Avenue - Third Street to Fourth Street

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $173,872 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Walnut Avenue - 3rd Street to 4th Street. Furnishing all tools, materials and labor and performing the work necessary to reconstruct approximately 1,053 square yards of 6-inch concrete pavement on Walnut Avenue from Third Street to Fourth Street. Work includes all excavation, base preparation, drives, curb and gutter, sidewalks and wheelchair ramps as specified in the plans for the complete roadway reconstruction. The information for Bidders, Forms of Bids, Form of Contract, Plans, Specifications and Form of Bid Bond, Performance and Statutory Bond, and other contract documents may be examined at the Office of the City Clerk of Ponca City, Oklahoma. The successful bidder shall submit Certification of Insurance for Public Liability and Workers Compensation in the amounts prescribed by Statute with the City of Ponca City named as additional insured Bids filed as provided herein shall be publicly opened on the above-mentioned time, date and place. All bids shall remain on file at least forty-eight (48) hours thereafter before a contract shall be made and entered into thereon. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of bids, as well as bids received after the time set for opening of bids, shall not be considered and will be returned unopened. All bids submitted must include the word "BID", the name of the bid item or project, and the time and date of the bid opening on the face of the sealed envelope. Bids shall be made in accordance with the plans, specifications, and other bidding documents which are on file and available for examination at the Office of the City Clerk of Ponca City, Oklahoma. A cashier's check, a certified check or a security bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to unsuccessful bidders

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents