Similar Projects
Lowering of SR 2058 (Hulton Road)
Bidding
PA

2021 Roadway Improvements Project
Bidding
Pittsburgh, PA

Riverview Avenue Subsidence
Post-Bid
Less than $30,000 est. value
Pittsburgh, PA 15219

2020 Paving Project
Post-Bid
Fairoaks, PA 15003

2019 Roadway Improvement Program
Results
Carnegie, PA 15106

2019 Roadway and Storm Sewer Improvements
Results
Pittsburgh, PA 15123

2021 Pavement Maintenance Program
Bidding
Pittsburgh, PA

Site 9 Mcclaren Road Development at Pittsburgh International Airport
Post-Bid
Pittsburgh, PA 15219

2019 Road Improvement Project
Results
PA

2021 Road Program
Bidding
$210,000 est. value
Pittsburgh, PA 15205

2020 Paving Program
Post-Bid
Oakmont, PA 15139

Turnback Road Reconstruction Project
Results
Sewickley, PA 15143

2021 Road Program
Bidding
Less than $350,000 est. value
Pittsburgh, PA

Propel Montour Elementary - Asphalt Resurfacing
Post-Bid
Pittsburgh, PA 15205

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Last Updated 02/18/2021 09:08 AM
Project Title

Architect Paving Replacement, Site Signage Mclean Architects, Llc And Electrical Improvements

Physical Address View project details and contacts
City, State (County) Upper St Clair, PA 15241   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Upper St. Clair School District is requesting bids for Paving Replacement, Site Signage and Electrical Improvements, with two (2) separate prime contracts, one for General Construction and one for Electrical Construction. General Construction work includes, but is not necessarily limited to, erosion and sedimentation control, excavation, grading, subgrade preparation, seeding, asphalt milling and paving, concrete curbs and walks, catch basins and catch basin repairs, speed bumps and parking bumpers, installation of a traffic control lift arm assembly, fencing and gates, bollards, signage, and line painting. Sites for GC work include Upper St. Clair High School, Eisenhower Elementary School, and Baker Elementary School. Electrical Construction work includes, but is not necessarily limited to, electrical conduit and duct banks, installation of wiring, fiber, electrical devices and lighting, site lighting and light poles, installation and wiring of security cameras (cameras provided by owner), and conduit, electrical and low-voltage wiring and connections for an automatic traffic control lift arm assembly (lift arm assembly provided and installed by General Contractor.) Electrical contract work is limited to the Upper St. Clair High School site.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents