Similar Projects
Unit Pricing Construction Management Services
Term Contract
Post-Bid
Chicago, IL

Pest Control Services
Post-Bid
Oak Park, IL

Advanced Process Welders and Accessories
Term Contract
Results
Addison, IL 60101

Fire Suppression and Sprinkler System Testing Services
Term Contract
Results
Rock Island, IL

Pest Control Services
Post-Bid
Peoria, IL 61605

CISCO Switch Upgrade
Term Contract
Results
Springfield, IL

Pest Control Services
Post-Bid
Geneva, IL

Chemical And Hazardous Waste Removal And Disposal
Term Contract
Results
Charleston, IL 61920

Professional Services - IT Projects
Post-Bid
Buffalo Grove, IL 60089

2021 Plumbing Services
Term Contract
Results
Aurora, IL 60505

Gutter Cleaning Services
Term Contract
Post-Bid
IL

Lead (Based Paint) Hazard Reduction Program (Lhrp)
Term Contract
Results
Less than $3,130 est. value
Moline, IL 61265

Pest Control Services
Term Contract
Post-Bid
Geneva, IL 60134

Health Department Custodial Services
Term Contract
Results
Peoria, IL 61602

Mobile Hand Wash Stations
Post-Bid
Elgin, IL 60120

Reported 10/28/2021 12:00 AM
Project Title

Fire Station 3: Fire Alarm and Clean Agent System

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60014   (McHenry County)
Category(s) Single Trades
Sub-Category(s) Fire Protection, Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade of the existing fire alarm system and installation of a clean agent fire suppression system located at Fire Station #3, 844 Virginia Road. The City desires a turnkey project that includes all necessary work for a fully functional, addressable, nonproprietary fire alarm and clean agent fire suppression system. The project consists of two parts. The first part is upgrading the existing fire alarm system to an NFPA 72 compliant nonproprietary addressable system. The existing fire alarm control panel shall be removed at the existing location and replaced with the new fire alarm control panel. The vendor shall also remove all existing initiating and notification devices and replace them with addressable type devices. The second part of the project includes the removal of a portion of the wet sprinkler system in the backup data center located in the basement. The sprinkler system shall be capped at a remote location outside of the data backup center.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents