Similar Projects
201st Taxiway and Ramp Repair
Design
$250,000 to $500,000 est. value
MD

NAVFAC Washington, P3002 Par Relocate Hazardous Cargo Pad and EOD Proficiency Range
Design
Andrews Air Force Base, MD 20762

Replace and Upgrade Taxiway Whiskey Phase IV
Bidding
Andrews Air Force Base, MD

College Park Airport Taxiway Rehabilitation
Infrastructure
Bidding
College Park, MD 20740

Taxiway W-6 Constructability Review, Joint Base Andrews
Post-Bid
Andrews Air Force Base, MD

Taxiway B Pavement Maintenance project for Talbot County at Easton/Newnam Field Airport
Post-Bid
Easton, MD 21601

Taxiway Whiskey Repair Joint Base Andrews
Results
Andrews Air Force Base, MD 20762

Garrett County Airport West Apron Construction Project
Results
$5,000,000 to $10,000,000 est. value
Accident, MD 21520

Runway Traction Sand
Post-Bid
Glen Burnie, MD 21061

RUNWAY 9-27 REHABILITATION
Results
Hagerstown, MD

Reconstruct Runway 14-32 and Improve RSA Ocean City Municipal Airport
Post-Bid
Ocean City, MD

Relocate Parallel Taxiway - Phase 1
Results
Frederick, MD 21701

Crack Seal Repair & Remarking of RW 14-32
Post-Bid
Gaithersburg, MD 20879

Runway 4-22 Obstruction Removal - Phase 1 Easton/Newnam Airport
Results
Easton, MD 21601

Runway 4-22 and Runway 15-33 Obstruction Removal - Phase 2 Easton/Newnam Field Airport (ESN)
Infrastructure
Post-Bid
Easton, MD

Reported 06/28/2021 12:00 AM
Project Title

Davis Airport Runway Extension Earthwork

Physical Address View project details and contacts
City, State (County) Gaithersburg, MD 20882   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents