Similar Projects
Ocean Park Rehabilitation - Town Of Oak Bluffs
Infrastructure
Conception
$5,000,000 CJ est. value
Oak Bluffs, MA 02557

Sea View Avenue Seawall - Town of Oak Bluffs
Infrastructure
Conception
$2,500,000 CJ est. value
Oak Bluffs, MA 02557

dupeNew Building
New Construction, Infrastructure
Design
Edgartown, MA 02539

Quenomica Preserve North Universal Access Project
New Construction, Infrastructure
Bidding
$50,000 CJ est. value
Edgartown, MA 02539

Wastewater Treatment Facility Upgrade - GC Bidders
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
West Tisbury, MA 02568

Tree Removal/Land Clearing for 55 West William Street
Infrastructure, Alteration
Post-Bid
Tisbury, Vineyard Haven, MA 02568

RFQ Construction Manager at Risk - Tisbury School Renovation and Addition Tisbury, Massachusetts
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$41,000,000 CJ est. value
West Tisbury, MA 02568

Tisbury School Addition and Renovation - Sub Bid
Addition, Demolition, Renovation, Infrastructure
Results
$22,384,557 CJ est. value
West Tisbury, MA 02568

Pedestrian and Bicycle Improvements at Various Locations
Infrastructure
Results
$2,119,470 CJ est. value
Lenox, MA 01240

Paving Around New Chemical Storage Shed - GC
New Construction, Infrastructure - 13,600 SF
Construction
$75,000 CJ est. value
Oak Bluffs, MA 02557

Edgartown Bay Road Yoga Barn
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Edgartown, MA 02568

East Chop Bulkhead - Town of Oak Bluffs
Infrastructure
Conception
$250,000 CJ est. value
Oak Bluffs, MA 02568

Marthas Vineyard Airport Wastewater Treatment Facility (WWTF) Upgrades - Sub Bid
Renovation, Infrastructure
Results
$1,441,376 CJ est. value
West Tisbury, MA 02575

Lake Ave Bulkhead - Town of Oak Bluffs
Infrastructure
Conception
$4,500,000 CJ est. value
Oak Bluffs, MA 02539

Last Updated 09/26/2022 03:36 PM
Project Title

Marthas Vineyard Airport Wastewater Treatment Facility (WWTF) Upgrades - GC Bid

Physical Address View project details and contacts
City, State (County) West Tisbury, MA 02575   (Dukes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $8,767,677 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Martha's Vineyard Airport Commission (Owner) will receive sealed Bids for Martha's Vineyard Airport WWTF Upgrades, CWSRF #6828, including facility building & treatment system improvements; sewage treatment system upgrades; SCADA/electrical/Site Work, Business Park Pump Station improvements. Substantial Completion: within 540 calendar days. Final Completion: within 630 calendar days. See Section 00 11 16 Invitation to Bid of Bidding Documents for more information. Bid security: 5% of General Bid amount. Register via email with dandrews@woodardcurran.com (copy to shines@woodardcurran.com); subject "Martha's Vineyard Airport - WWTF Upgrades". Instructions will follow email. DCAMM certification for General Bidders: sewage and water treatment plants and pumping stations. DCAMM certification for Sub-Bidders: roofing & flashing; miscellaneous & ornamental iron; painting; HVAC; electrical; masonry. The Project is subject to Massachusetts General Laws, Chapter 149, Sections 44A-J & prevailing wage rates per Dept of Labor Standards under MGL c149 Sections 26 to 27D inclusive, as amended. Project is funded in part with monies made available by the Clean Water State Revolving Fund (SRF) and is to be funded in part by the Massachusetts Clean Water Trust. Comply with: EPA, MassDEP/DMS provisions/policies and Davis-Bacon Act and wage requirements. DBE goals applicable to the total dollars of construction Contract: minimum 4.20 % D/MBE participation & 4.50 % D/WBE participation by certified DBEs. Work Site locations 1. The WWTF Project Work Site location is at the Martha's Vineyard Airport, 71 Airport Road, West Tisbury, MA 02575. 2. The Business Park pump station Project Work Site is located on E. Line Road adjacent to the intersection of A. Street in Edgartown, MA 02539.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents