Similar Projects
Comprehensive District Wide Roof Inspection and Report of All Roofs
Term Contract
Design
Cody, WY 82414

Removal and Replacement of Roofs at 525 E. Grand Avenue and 501 E. Ivinson Avenue
Renovation
Sub-Bidding
$80,000 CJ est. value
Laramie, WY 82070

Flat Roof Replacement of the 1941 Building at the Wyoming Veterans Home
Renovation
Sub-Bidding
$300,000 CJ est. value
Buffalo, WY 82834

Natatorium Partial Reroof - Rebid
Renovation
Post-Bid
$345,000 CJ est. value
Green River, WY 82935

Mechanic/Traffic Building Roof Replacement - Basin
Alteration
Post-Bid
$400,000 est. value
Basin, WY 82410

Fire Station No. 3 Roof Replacement
Renovation
Results
$424,880 CJ est. value
Casper, WY 82601

2022 Campus Roof Replacements Phase II
Alteration
Results
$600,000 est. value
Laramie, WY 82071

Fire Academy Roof Replacement
Renovation
Sub-Bidding
$150,000 CJ est. value
Riverton, WY 82501

Structural Maintenance and Roof Reconstruction
Alteration
Post-Bid
$290,000 est. value
Casper, WY 82604

Roof Projects 2022
Alteration
Results
$300,000 est. value
Rock Springs, WY 82901

Repair Roof Building 34, 35, 26, 09
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
Cheyenne, WY 82001

Sheridan College Whitney Business Wing Roof Replacement
Alteration
Results
$600,000 est. value
Sheridan, WY 82801

Roof Replacement and Siding Replacement
Renovation
Post-Bid
$200,000 CJ est. value
Powell, WY 82435

Midwest School Roof Replacement
Renovation - 80,100 SF
Results
$1,798,880 CJ est. value
Midwest, WY 82643

Wyoming Game and Fish Department Speas Hatchery Settling Pond Roofing Project
Renovation
Post-Bid
$700,000 CJ est. value
Casper, WY 82604

Last Updated 10/13/2023 12:03 AM
Project Title

Cheyenne Kiwanis Community House Roof Replacement

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $179,143 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Removal of existing roof system in its entirety. Includes the removal of a built up roof system and laminated asphalt shingles, and gutter and downspouts. 2. Installation of a new roof system in its entirety. Includes the installation of EPDM singleply membrane including all necessary flashings and laminated shingles as indicated within the contract documents as well as potential replacement of existing materials where damaged as outlined in the unit cost and contingency allowances. Also includes the modification of existing parapet walls, curbing, and flashings to increase the depth of the roofing system. Bid Results Cheyenne Kiwanis Community Built Right LLC - $179000 OSB Sheathing Substrate Built Right LLC - $63 Plywood Sheathing Built Right LLC - $80

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents