Similar Projects
Tap Society Restaurant
New Construction, Infrastructure - 3,500 SF
Conception
$500,000 to $1,000,000 CJ est. value
Rosemount, MN 55068

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

Suite Living of Rosemount
New Construction, Infrastructure
Design
$10,300,000 CJ est. value
Rosemount, MN 55068

Suite Living of Rosemount
New Construction, Infrastructure
Design
$10,300,000 CJ est. value
Rosemount, MN 55068

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

New County Library at Marie and 7th Avenues - Dakota County
New Construction, Infrastructure - 16,146 SF
Post-Bid
$6,000,000 CJ est. value
South Saint Paul, MN 55075

Treetop Trail Owner's Rep Services
Renovation, Alteration
Post-Bid
$50,000 est. value
Apple Valley, MN 55124

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

2021 Crack Sealing and Seal Coating
Results
MN

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

2022 Water Meter Procurement
Infrastructure
Post-Bid
$1,100,000 est. value
Lakeville, MN

Last Updated 02/27/2023 05:09 PM
Project Title

South Valley Park Phase 1 Improvements

Physical Address View project details and contacts
City, State (County) Inver Grove Heights, MN 55076   (Dakota County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,381,104 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This is a lump sum bid contract for Phase 1 Improvements to South Valley Park. The base bid consists of (3) three lump sum unit amounts as described below. Each unit amount shall include all cost required to complete that portion of the project per the drawings and specification. The three unit amounts shall be added together and included at the end as a bid total that shall cover all the work as described in the plans and specifications. 1. SITE WORK: This lump sum unit amount shall include all site work, including: building and site demo and removals, survey and staking, erosion control, earthworks, sanitary and water utility service to shelter, stormwater utilities, concrete and bituminous paving, curbing, concrete steps and handrail, site electrical, landscaping and site restoration as described in the bid documents. Include all mobilizations, permits, fees, and related items required for a complete job. 2. PARK SHELTER: This lump sum unit amount shall include all architectural, structural, mechanical, shelter electrical, and plumbing items as described in the bid documents. Include all mobilizations, permits, fees, and related items required for a complete job. 3. WELL LINE: This lump sum unit amount shall include all work required to complete the well line work for a complete job as described in the bid documents. Include all mobilizations, permits, fees, and related items required. Direct inquiries to HKGi, Jody Rader at (612) 220-8990 or email jody@hkgi.com. No bidder questions can be addressed after 12:00 pm on Tuesday, January 24, 2023. The City Council will consider award of contract at their regular meeting held at City Hall on February 13 th , 2023, at 6:00 p.m. in the Council Chambers at 150 Barbara Avenue.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents