Similar Projects
N041--Sources Sought Notice Install Cooling Tower Gearbox
Post-Bid
Orlando, FL

HVAC Maintenance and Small Projects
Term Contract
Post-Bid
Orlando, FL 32802

Replacement In-Kind of one (1) - Sixty (60) Ton Chiller at the Pompano Turnpike Operations Center
Results
Ocoee, FL 34761

A/C Removal ATaS Lab NAWCTSD
Results
Orlando, FL 32826

Air Duct Cleaning Services
Term Contract
Post-Bid
Orlando, FL 32827

Internal Operations Centre I (IOC I) Communications Room HVAC Improvements
Results
Less than $100,000 est. value
Orlando, FL 32801

RBELC HVAC Server Room Renovations
Post-Bid
Orlando, FL 32800

Data Center HVAC Preventive Maintenance and Repairs Services
Term Contract
Results
Orlando, FL 32827

HVAC Mechanical Services
Term Contract
Post-Bid
Orlando, FL 32802

Preventative Maintenance and Operations of Air Compressors and Dryers for the Orange County Convention Center
Term Contract
Results
FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Correction Building HVAC Unit Replacement
Results
Less than $1,456,440 est. value
Orlando, FL 32839

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

HVAC System Replacement and Roof Replacement at the OHA Executive Office
Results
$354,545 est. value
Orlando, FL 32803

York Chiller Maintenance Services
Post-Bid
Orlando, FL

Last Updated 10/13/2021 02:01 PM
Project Title

Y1NB--FY21: NRM TIER 2 (PROJ: 675-21-103) Replace Lake Baldwin Cooling Towers

Physical Address View project details and contacts
City, State (County) Orlando, FL 32803   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT NO./TITLE: 675-21-103, Design-Build (D/B Services, Replace Lake Baldwin Cooling Towers The Department of Veteran Affairs (VA), Veterans Integrated Service Network (VISN) 8 has a requirement to provide all design/build services to include labor, materials, tools, equipment, supervision and all other resources necessary for the design and construct all the elements to install two (2) new cooling towers and associated piping and equipment, including, but not limited to pumps, VFDs, flow meters, electronic valves, HVAC controls at the Orlando VA Healthcare System, Lake Baldwin Campus in accordance with the solicitation, Statement of Work (SOW) and other specification

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Cooling Towers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents