Similar Projects
Terminal Electrical Systems Upgrade
Alteration
Bidding
$996,917 est. value
Dallas, TX

Terminals A, B, C, D, E UPS Replacements
Alteration
Bidding
$1,542,546 est. value
Dallas, TX

Lighting Installation
Post-Bid
Irving, TX 75061

Mechanical and Electrical Maintenance of Woodall Rodgers Tunnel
Post-Bid
Dallas, TX 75201

Citywide Facilities Maintenance Services
Results
DeSoto, TX 75115

Generators for Special Events
Term Contract
Results
Richardson, TX 75080

Phase 1 - East Campus Ductbank
Alteration
Bidding
Dallas, TX 75235

Term Contract - Services for Various Substation Power Transformers, Circuit Breakers, SF6 Gas and Oil Analysis
Term Contract
Post-Bid
$1,000,000 est. value
Garland, TX 75040

Maintenance and Repairs for US75 and Underpass Street Lighting
Term Contract
Results
$49,000 est. value
Richardson, TX 75080

GP and L College to Brand 138KV Transmission Line Reconstruction Materials
Alteration
Bidding
Garland, TX

Ray Olinger Power Plant UPS System Battery Upgrade
Post-Bid
Garland, TX 75040

Newman Substation Cable Trough
Results
Garland, TX 75040

Electrical Maintenance Repair Services for Wichita Falls
Alteration
Bidding

J020--NEW - Garland-157V Motors and Drives
Post-Bid
Dallas, TX 75216

Lake Crossing - Wynn Joyce to Miller and Ben Davis Construction (GP&L)
Results
$6,000,000 est. value
Garland, TX 75040

Last Updated 11/05/2021 10:41 AM
Project Title

Skylink UPSs Replacement

Physical Address View project details and contacts
City, State (County) Dallas, TX   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,976,636
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing obsolete UPS units for the Skylink Train System. These units are located at the Skylink Stations and at the Skylink Maintenance & Storage Facility. 22 units will be replaced. The work will also include installing maintenance bypass panels to AC UPS’s to provide service without power interruption, as well as installing a second electrical feed from the existing electrical power distribution panel to the newly provided wall mounted safety disconnects to allow parallel installation of the new units.

Details

Division 09 - Finishes.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents