Similar Projects
Big Shine Addition
Addition - 9,820 SF
Conception
$1,000,000 est. value
Newburgh, NY 12550

True Storage / New Windsor
New Construction
Conception
$3,000,000 est. value
New Windsor, NY 12553

RDM Warehouses
New Construction - 345,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Montgomery, NY 12549

Superio Warehouse Addition
Addition - 25,000 SF
Design
Chester, NY

New Storage Building (Phase I) New Fire Station (Phase II)
New Construction, Infrastructure
Bidding
$2,776,000 CJ est. value
New Windsor, NY 12553

New Storage Building (Phase I) New Fire Station (Phase II)
New Construction, Infrastructure
Bidding
$2,776,000 CJ est. value
New Windsor, NY 12553

Remediation and Purchase of 842 Broadway
Demolition, Infrastructure
Post-Bid
Newburgh, NY 12550

134 Neeleytown Road Warehouse
New Construction - 317,500 SF
Post-Bid
$10,000,000 CJ est. value
Montgomery, NY 12549

Snow Removal Equipment Storage Building at Orange County Airport
New Construction
Results
Montgomery, NY 12549

Roof Replacements and Storage Buildings Construction
New Construction, Alteration
Results
$842,542 to $1,139,910 est. value
Bear Mountain, New Windsor, Stony Point, Valley Cottage, Woodbury, NY 12553

President Container Storage
Addition - 98,500 SF
Construction
$7,309,746 est. value
Middletown, NY 10941

Project Sailfish Warehouse Distribution Center
New Construction - 1,015,740 SF
Construction
$85,000,000 est. value
Montgomery, NY 12549

Guardian Self Storage
Addition - 16,100 SF
Pending Verification
New Windsor, NY

Warriner Plumbing and Heating
New Construction - 55,600 SF
Conception
$6,000,000 est. value
New Windsor, NY 12553

Empire Properties
New Construction - 18,000 SF
Design
Less than $500,000 CJ est. value
New Windsor, NY

Last Updated 07/25/2022 01:34 PM
Project Title

Guardian Self Storage

Physical Address View project details and contacts
City, State (County) New Windsor, NY 12553   (Orange County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans consist of two additional climate controlled self-storage buildings. As of July 25, 2022, this project received conditional final approval from the planning board on July 13, 2022. This project is in design. Plans have not yet been submitted for final approval. A timeline for construction has not been disclosed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents