Similar Projects
Newton Farms Park Improvement - City of West Valley City
Infrastructure
Conception
$625,000 CJ est. value
West Valley City, UT 84128

Develop Maple Meadows II - City of West Valley City
Infrastructure
Conception
$2,800,000 CJ est. value
West Valley City, UT 84120

Olympia Hills
New Construction, Infrastructure
Design
$2,000,000,000 CJ est. value
Herriman, UT 84096

Chrome Works
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Salt Lake City, UT 84101

SLC DPU - New WRF Construction
New Construction, Infrastructure
Bidding
$60,000 CJ est. value
Salt Lake City, UT 84111

Concrete Demolition - Installation - Repair (Districtwide)
Infrastructure
Bidding
Sandy, UT 84092

Bueno Avenue Apartments
New Construction, Infrastructure
Post-Bid
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

20D: Kent Booster Pump Station Replacement Project Contractor Prequalification
Renovation
Results
West Valley City, UT 84120

Zone 3 Secondary Booster Pump Station Project
New Construction
Results
$2,010,000 est. value
Salt Lake City, UT

Brix
New Construction, Infrastructure
Construction
$55,000,000 CJ est. value
Salt Lake City, UT 84101

Pura Vita Senior Housing
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
West Jordan, UT 84088

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

South Main Street Apartments / Salt Lake City
New Construction, Infrastructure - 8,400 SF
Pending Verification
$150,000,000 CJ est. value
Salt Lake City, UT 84101

Develop Phase 1 of New Regional Park - City of West Valley City
Infrastructure
Conception
$5,000,000 CJ est. value
West Valley City, UT 84119

Last Updated 06/24/2023 04:32 AM
Project Title

New WRF SW1A Influent Pump Station (IPS)

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84116   (Salt Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $72,827,750 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction of a new IPS and force mains with an initial capacity of 105 million gallons per day (MGD) for Phase 1, with ultimate buildout capacity of 172 MGD. Major components of the pump station will include: Two (2) trench style, self-cleaning wet wells, five (5) 600 horsepower (hp) vertical turbine solids handling pumps connected to 42" diameter steel discharge headers, transitioning in a valve vault to two (2) 48" diameter HDPE force mains (approximately 5000 feet each), concrete junction structures, electrical building, pre-manufactured biofilter odor control system, pre-engineered metal buildings, 5 megawatt (MW) emergency/standby power generator system, civil site improvements, utility relocations, and control system required to operate and monitor the IPS. Bids will only be received from the following contractors which have been prequalified by the Owner to bid on this project: Archer Western Construction, LLC; MWH Constructors, Inc.; Ralph L. Wadsworth Construction Company, LLC; Sundt Construction, Inc.; and The Haskell Company.Contractors are prequalified to submit bids for the construction of the project. All Contractors who submit prequalification statements will be notified in writing if they did or did not prequalify. Post requests for information about this RFQ to U3P Utah Public Procurement Place. Location- 1805 W 500 S Salt Lake City, UT 84104 Question Submission Close Date 5/5/2023 2:00 PM MDT 1. Site preparation including demolition, clearing, grubbing, excavation, foundation preparation, backfill 2. Existing utility relocations 3. Two (2) pre-engineered metal buildings housing the IPS and electrical equipment 4. Two (2) trench style, self-cleaning wet wells side by side under same superstructure 5. Pump gallery consisting of five (5) vertical turbine solids handling pumps with space for a total of six (6) pumps, steel discharge headers, and valve pad. 6. Pre-manufactured biofilter odor control system 7. 4MW, n+1, emergency/standby power generator system , such that 4MW output is achievable even if one generator set is not operating 8. Yard utilities including fiber optic, ductbanks, potable water, non-potable water, natural gas, storm drains, influent sewer, and site drainage 9. Approximately 4,000 feet of duct bank connecting WRF site to IPS site 10. Civil site improvements including paving, grading, curb and gutter, sidewalk, chain link fencing, and landscaping for an approximate 8-acre site 11. HDPE forcemains from the valve pad header to station 2+57.46. 12. Installation of GFRP influent sewer from the influent pump station to the connection extended from MH#3. The Work will be Substantially Complete by March 19, 2026.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents