Similar Projects
Sycamore Water Well Improvements
Infrastructure
Bidding
Pasadena, TX

Certification and Calibration of Well Water Meters
Post-Bid
Houston, TX 77072

Air Stripping Tower at Water Well No. 2
Post-Bid
Houston, TX

Lift Station No. 3 and 4 Rehabilitation and Pump Replacement
Results
Spring, TX 77379

Construction of the Water Well No. 3 - Remote
Results
TX

Construction of the Remote Well Collection Line to Serve Rosehill Reserve
Post-Bid
TX

Construction of Water Well No. 5
Results
$2,254,000 est. value
Bunker Hill Village, TX

Water Plant No. 1 Well No. 2
Alteration
Post-Bid
TX

Monument Levee Pump Repair
Results
La Porte, TX 77571

Water Plant No. 1 Water Well No. 3
Infrastructure
Post-Bid
Houston, TX

Jasper Well No. 1 Transfer Pump Upgrades
Results
Houston, TX

Remote Well No. 2 Control Panel Replacement
Infrastructure
Post-Bid
TX

Seepex Progressive Pump
Results
$22,905 est. value
Houston, TX

Replacement Central Plant Chilled Water and Condenser Pumps - North Harris
Infrastructure
Post-Bid
TX

San Jacinto Battleground State Historic Site Pump Repair
Results
Less than $109,240 est. value
La Porte, TX 77571

Last Updated 03/29/2022 11:15 AM
Project Title

Remote Well Control Panel Replacement

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work primarily consists of the replacement and installation of a new water well panel at Harris County’s MUD No 70’s remote water well site. The Work in this project includes the following: 1.Removal and proper disposal of existing electrical equipment and appurtenances, complete in place at the remote well site on Connemara Dr, Cypress, TX. 2.Purchase and installation of new electrical equipment inclusive of proposed MCC, exhaust fan, and all appurtenances as shown in the plans and specifications for a full working system, complete in place.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents