Similar Projects
Shelburne Road Mixed Use Development
New Construction, Infrastructure - 490,200 SF
Conception
$144,800,000 CJ est. value
South Burlington, VT 05403

Temporary Shelter ( Cots ) Addition
Addition
Design
Burlington, VT 05401

Dorset Street And Rivers Edge Development
New Construction
Design
South Burlington, VT 05403

Burkeland Lane
New Construction, Renovation
Post-Bid
$4,000,000 est. value
Burke, VT 05871

Windsor Housing Trust & Evernorth Units
New Construction
Post-Bid
Putney, VT

Clark Canal and Phelps
Renovation
Construction
Brattleboro, Windsor, VT

Clark Canal and Phelps
Renovation
Construction
Brattleboro, Windsor, VT

Blakely Road Residential
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Colchester, VT 05446

Trinity Baptist Church Residential Units
New Construction
Pending Verification
Williston, VT 05495

New Duplex Development
New Construction
Design
Burlington, VT 05401

Firehouse Apartments
New Construction
Post-Bid
Bristol, VT

Multifamily Residence Recovery Housing
Renovation
Construction
$3,000,000 est. value
Barre, VT 05641

North Winooski Avenue Project
New Construction
Pending Verification
Burlington, VT 05401

Whisper Wind Townhouses
New Construction
Design
Milton, VT 05468

Evernorth & Lamoille Housing
Renovation
Construction
Stowe, VT 05672

Last Updated 04/24/2023 04:13 PM
Project Title

NewStory Emergency Shelter Expansion

Physical Address View project details and contacts
City, State (County) Rutland, VT 05701   (Rutland County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

On behalf of NewStory Center, Inc., Naylor & Breen Builders is requesting subcontractor and vender proposals from qualified firms for the NewStory Emergency Shelter Expansion renovations project. Located in Rutland, Vermont, the project consists of the renovation of an existing three-story building into shelter space accommodating 7 bedrooms and 5 bathrooms. Two minor components at buildings nearby include building entry modifications. Renovations are to include demolition, sitework and amenities, asphalt paving, fencing, concrete, metals, carpentry, insulation, air sealing, roofing, interior and exterior finishes, doors and windows, drywall, flooring, painting, manufactured casework, appliances, specialties and accessories, mechanical/plumbing, electrical, and fire protection. Construction is anticipated to start February/March 2023. All bidders must be able to provide references upon request for similar size and type of project to demonstrate bidder is qualified to perform or provide the work being bid. Contract security in a form acceptable to the Owner and Construction Manager may be required and potential bidders shall demonstrate the ability to provide such security. The cost of such security should not be included in the bid. Plans, specifications and bid packages will be made available for review and/or purchase on Monday, January 18, 2023. Walkthroughs may be coordinated by contacting Miles Krans, mkrans@naylorbreen.com. Deadline for final submission of questions is Wednesday, February 1, 2023 at 5:00 PM. Bid submission deadline to Naylor & Breen: Tuesday, February 7, 2023 at 2:00PM. Minority-owned, women-owned, locally-owned and Section 3 businesses are strongly encouraged to respond. Questions and proposals should be directed in writing to Miles Krans at mkrans@naylorbreen.com.

Details

3 Stories Above Grade, Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents