Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Pleasant Township Road Improvements 2020
Post-Bid
Mount Vernon, OH 43050

College Township Roadway Improvements 2020
Post-Bid
Gambier, OH 43022

Annual Resurfacing - 2020
Results
$925,732 est. value
OH

2020 Township Roadway Improvements
Results
Martinsburg, OH 43037

Hilliar Township Roadway Improvements 2020
Post-Bid
Centerburg, OH 43011

OPWC Roadway Roadway Improvements 2020
Results
Centerburg, OH 43011

Middlebury Township Roadway Improvements 2020
Post-Bid
Fredericktown, OH 43019

Crack and Joint Sealant (MBE Only)
Term Contract
Results

Road Improvements 2020
Post-Bid
Howard, OH 43028

Resurfacing of the K-12 Bus Loop and the Main Parking Lot
Results
Fredericktown, OH 43019

Monroe Township Roadway Improvements 2020
Post-Bid
Mount Vernon, OH 43050

Bennington Township Resurfacing Project
Results
Centerburg, OH

Morgan Township Roadway Improvements 2020
Post-Bid
OH

North Main Street/Chestnut Street Intersection Modifications
Results
$447,000 est. value
Mount Vernon, OH 43050

Last Updated 10/06/2021 09:05 AM
Project Title

Paving Projects

Physical Address View project details and contacts
City, State (County) Mount Vernon, OH 43050   (Knox County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid should include: Milling of area, Clean area, Tack coat and install asphalt, Roll finish, AC bands should be installed where new asphalt meets existing asphalt, Painting of all areas. Mill entire area, and entrances, catch basins, concrete walks and speed bumps as needed. Reclaimed asphalt pavement (RAP) will not be permitted to be used in any surface courses. Catch basins and inlets shall be level in accordance with the design and dimensions and to line and grade as originally set. In the case where adjustments must be made, they will be made prior to laying the asphalt. There are a total of 4 catch basins to be replaced. There are 3 catch basins at Pleasant St. and 1 at Central Office. All edges of the paving process will be sharp, clean and sealed by the contractor. Paint all areas as they were originally. This should include: parking spaces, crosswalks, stop bars, handicap parking, hash-outs, dividing lines, arrows, fire lanes, and no parking.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 09 - Finishes, Painting and Coating.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Speed Bumps, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Utility Storm Water Treatment, Catch Basin Insert Utility Storm Water Filters, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents