Similar Projects
Last Updated | 09/17/2020 09:22 AM |
Project Title | Roof Replacement at Henry Wilson Memorial School |
Physical Address | View project details and contacts |
City, State (County) | Farmington, NH 03835 (Strafford County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Remove EPDM membrane 2. Re-use the existing 3" polyisocyanurate, if dry. 3. Adhere existing insulation in low rise foam adhesive, as well as an additional 3" flatstock polyisocyanurate. 4. Adhere 1/2" densdeck coverboard 5. Adhere 60 mil TPA/TPO/EPDM membrane in single ply WB adhesive. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |