Similar Projects
J Avenue Filter Building Roof Replacement - City of Cedar Rapids
Alteration
Conception
$1,250,000 est. value
Cedar Rapids, IA 52402

AW Family Aquatic Center Roof Replacement - 23072- City of Davenport
Infrastructure
Conception
Less than $150,000 est. value
Davenport, IA 52803

Essex CSD Elementary Re-Roof Rebid
Renovation
Sub-Bidding
$411,000 CJ est. value
Essex, IA 51638

Campus Wide Roof Maintenance and Repair Services
Renovation
Sub-Bidding
$300,000 CJ est. value
Iowa City, IA 52240

Roof Tear-Off and Replacement
Alteration
Post-Bid
Clinton, IA

Sheriff Office - Roof Removal and Replacement
Alteration
Post-Bid
Dubuque, IA 52001

Young Arena Southeast and Southwest Roof Replacement
Alteration
Results
Waterloo, IA 50701

Residential Roof Removal and Replacement
Alteration
Results
IA

Library Roof - City of Johnston
Infrastructure
Conception
$145,000 est. value
Johnston, IA 50131

2022 Roof Replacement at Gaylord Smith Building
Alteration
Post-Bid
Sioux City, IA 51106

2021 College Community Roof Improvements
Alteration
Results
$630,000 est. value
Cedar Rapids, IA 52404

Pearson Hall Re-Roofing Project
Alteration
Post-Bid
$200,000 est. value
Maquoketa, IA 52060

Camp Dodge Building M-15
Renovation, Alteration
Results
Johnston, IA 50131

Community Center Roof and South Wall Repair (Plus Various Window Trim)
Renovation
Post-Bid
$400,000 CJ est. value
Rowan, IA 50470

Johnson County Celebration Barn Roof Replacement
Alteration
Results
$300,000 est. value
Solon, IA 52333

Last Updated 09/08/2022 03:43 PM
Project Title

Carnegie-Stout Library - Roofs 1 and 2 Restoration Project

Physical Address View project details and contacts
City, State (County) Dubuque, IA 52001   (Dubuque County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $209,500 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Carnegie-Stout Library Roofs 1 & 2 Restoration: Scope of work to include the installation of a new monolithic urethane liquid applied fully reinforced restoration of not less than 80mils with a 20 year warranty. Installation to include the proper surface preparation, replacement of wet insulation, removal of existing walk pads, and installation of new metal as identified in the bid documents. Base Bid - Roofs 1 & 2 restoration as described in the Contract Documents. Each Bidder must accompany its Bid with a Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental entity. The Bid Bond must contain no conditions except as provided in this section.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents