Similar Projects
Church Creek Flood and Resilience - Mowler Court Project
Infrastructure
Bidding
Charleston, SC

Buck Island Drainage Improvements
Infrastructure
Bidding
Bluffton, SC

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

Huger Street and King Street Intersection Drainage Improvements Project
Post-Bid
Charleston, SC

FY20 Clouter Creek North Cell Ditching
Results
$500,000 to $1,000,000 est. value
Charleston, SC 29403

Construction Services Low Battery Restoration Project - Phase II
Results
Charleston, SC 29401

Culvert Repair -S-562
Infrastructure
Bidding
SC

Wells Japanese Garden Pond Renovation
Post-Bid
Newberry, SC 29108

Willow Forks Road Drainage Project
Results
Lexington, SC 29072

Culvert Repair -S-105
Infrastructure
Bidding
SC

Shoreline Stabilization Project
Post-Bid
Georgetown, SC 29440

Aluminum Pipes - York County
Term Contract
Results
SC

Drainage Swale Infill for UCME
Infrastructure
Bidding
$25,000 to $35,000 est. value
Greenwood, SC 29646

Taylor Street Area Drainage Study
Post-Bid
Lancaster, SC

Pipe- Hall Spencer Road - York County
Results
SC

Reported 03/24/2022 12:00 AM
Project Title

Airfield Drainage Improvement

Physical Address View project details and contacts
City, State (County) Winnsboro, SC 29180   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves necessary airfield drainage improvements on the north side of the Airport. These improvements include removing and replacing approximately 800 feet of 36” RCP approximately 30 feet deep, replacing existing inlets and slope drains with Type 112 Inlet and concrete drainage flumes. In addition, the project will include a displaced threshold, demolition, erosion control, minor electrical and markings. The project consists of daytime work. Runway 4-22 will be open and Runway 22 End Threshold will be displaced.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents