Similar Projects
Plumbers for Replacement of Lead Service Lines on Public and Private Property - Child Care Grant
Term Contract
Bidding
$330,000 est. value
Cincinnati, OH

Water Treatment Plant Filter Rehabilitation Project
Renovation
Bidding
$875,000 CJ est. value
S Zanesville, OH 43701

4 inch Natural Gas Line
Renovation
Sub-Bidding
$100,000 CJ est. value
Lebanon, OH 45036

Remove / Install Hot Water Pumps
Renovation
Sub-Bidding
$200,000 CJ est. value
Lebanon, OH 45036

T&M Contract Plumbing - HVAC - Refrigeration
Term Contract, Alteration
Post-Bid
Akron, OH

CSC-21501 Maintenance of HVAC, Plumbing and Emergency Power Supply (EPS) Systems
Term Contract
Post-Bid
Whitehall, OH 43213

Water Treatment Plant Improvements - Phase 1
Renovation
Results
$1,670,665 CJ est. value
Wadsworth, OH 44281

Plumbing Services Repair and Maintenance
Results
Cleveland, OH

First Street Waterline Replacement (CDBG)
Infrastructure
Bidding
$123,000 CJ est. value
Continental, OH 45831

Plumbing and Related Supplies Part I of II
Term Contract
Sub-Bidding
Dayton, OH 45402

Plumbing Maintenance and Repair Services for Campus
Alteration
Post-Bid
Cincinnati, OH

Wright Point II Backflow Preventer
Results
Dayton, OH 45431

Barres Road Realignment
Infrastructure
Bidding
$250,000 CJ est. value
North Ridgeville, OH 44039

Plumbing Services at COTA Facilities
Term Contract
Sub-Bidding
Columbus, OH 43215

Plumbing for Urban Garden Program
Term Contract
Post-Bid
Dayton, OH

Last Updated 11/09/2022 03:13 PM
Project Title

Water Transmission Main Replacement

Physical Address View project details and contacts
City, State (County) Greenville, OH 45331   (Darke County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,821,519 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 13, 2022 , this project has not yet been awarded. A timeline for award has not yet been established.** Repoer Id - 23831D1-0322-02 Engineers Estimate: $2,794,340.00 for the base bid, $1,484,310.00 for alternate 1, $314,430.00 for alternate 2, $235,660.00 for alternate 3 and $50.00 for alternate 4 The Project includes the following Work: The installation of 24" water transmission mains along State Route 502 and W. Main Street and the installation of 12" water main along Vine Street and W. Main Street. All official notifications, addenda, and other Bidding Documents will be offered through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office of Choice One. Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bidder must submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Project Manager, (Jacob L. Bertke), (jlb@choiceoneengineering.com). If no response within 24 hours call (513-239-8554).

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents