Similar Projects
Faithful Friends Animal Sanctuary Parking Expansion
New Construction, Addition
Design
Wilmington, DE 19804

Brandywine Springs School Pavement Rehabilitation
Infrastructure
Bidding
Wilmington, DE 19808

Parking Lot Expansion at Early Learning Center
Infrastructure
Bidding
$700,000 est. value
Wilmington, DE 19804

CM/GC Services: I-95 and SR 896 Interchange
Post-Bid
Newark, DE

Biden Storm Water and Curbing Repair
Infrastructure
Post-Bid
New Castle, DE

Wilmington DMV - Phase 1 Lobby Renovation
Renovation, Demolition
Results
New Castle, DE 19720

HSIP NCC, SR 273 and I-95 Interchange Improvement
Results
Less than $11,754,456 est. value
DE

SR72, MCCOY ROAD TO SR71
Infrastructure
Bidding
$3,000,000 est. value
Newark, DE 19718

Paving
Term Contract
Post-Bid
DE

High Friction Surface Treatment, 5-200K
Results
Less than $2,354,058 est. value

MATOC - Concrete Repair and Asphalt Paving
Term Contract, Alteration
Post-Bid
$100,000 to $250,000 est. value
New Castle, DE 19720

A Street Shared Use Path, Wilmington
Results
Wilmington, DE 19801

District-Wide Paving Services
Term Contract
Post-Bid
Bear, DE

Wilmington DMV - Asphalt and Concrete Upgrades
Results
New Castle, DE 19720

Augustine Cut Off Bicycle Network Improvements
Infrastructure
Post-Bid
New Castle, DE

Last Updated 04/22/2022 07:21 AM
Project Title

Pavement and Rehabilitation Pedestrian Connection Improvements, North I, 2022

Physical Address View project details and contacts
City, State (County) DE   (New Castle County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements consist of furnishing all labor and materials for addressing non-compliant pedestrian connections that were not addressed on previous pave and rehabs. Pedestrian connections, curb and utility adjustments, and pavement markings

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents