Similar Projects
CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

Bangor Keyport Force Main Replacement
Renovation, Infrastructure
Bidding
$23,200,000 to $24,700,000 est. value
Poulsbo, WA 98370

Wastewater Treatment Facility Upgrade
New Construction
Bidding
$16,800,000 to $17,800,000 est. value
Sultan, WA 98294

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

North Mercer Island and Enatai Interceptor Upgrade - Pump Station Improvements
Alteration
Post-Bid
Mercer Island, WA 98040

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Biosolids Dewatering and Lift Station Improvement
Renovation
Post-Bid
Twisp, WA

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Results
$2,558,000 est. value
Seattle, WA 98177

Havana Well Station - Phase One
New Construction, Infrastructure
Post-Bid
Spokane Valley, WA

Thomas Lake Lift Station Replacement
Renovation
Results
$2,187,000 est. value
Mill Creek, WA 98012

Emerson Avenue Wastewater Pump Station
New Construction
Post-Bid
Hoquiam, WA 98550

Airlift Pump Station 38 Replacement
Renovation
Results
$1,300,000 est. value
Seattle, WA 98116

Euclid Sewer Pump Station Improvements
Renovation
Post-Bid
$450,000 to $550,000 est. value
Bellingham, WA 98229

Glenwood Pump Station Transfer Switch
Renovation
Results
$50,000 to $55,000 est. value
Vancouver, WA 98662

Last Updated 03/09/2022 11:38 AM
Project Title

Cedar Hills Regional Landfill Leachate Pump Stations 1A Electrical 2 and 3 Upgrades

Physical Address View project details and contacts
City, State (County) Maple Valley, WA 98038   (King County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $627,600
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Leachate Pump Station Upgrades: includes upgrading leachate pump stations 1A electrical, 2 and 3. Work will consist of upgrading and adding electrical and control equipment and devices, enclosures and panels, operator interfaces, stilling wells, coordinating with on-call PLC programmer, and providing new sets of shop drawings for the control system(s). Work at PS-2 and PS-3 will require installation of temporary bypass pumping systems to enable work within the wet wells. Mechanical and civil work will be required to complete this work, including demolition and removal, and ancillary equipment installation.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents