Similar Projects
Procurement of Smart Lockers
Alteration
Bidding
Less than $200,000 est. value
Atlanta, Decatur, GA 30324

Procurement of Smart Lockers
Alteration
Bidding
Less than $200,000 est. value
Atlanta, Decatur, GA 30324

Vacancy Rehab Services
Post-Bid
Montezuma, GA

Replacement All Kitchen Cabinets, Sinks, Countertops , and Plumbing in Thirty four (34) Units
Post-Bid
Americus, GA

Nationwide MARFORRES Hazardous and Nonhazardous Waste Disposal and Environmental Services
Results

Nationwide MARFORRES Hazardous and Nonhazardous Waste Disposal and Environmental Services
Results

GSU - Clarkston Building CC 2nd Floor Laboratory Cabinet Replacement
Alteration
Bidding
$800,000 est. value
Atlanta, GA 30303

Remodeling Services Carpet And Electrical
Post-Bid
Columbus, Midland, GA 31820

Repair Exterior and Interior, Bldg 510
Results
$250,000 to $500,000 est. value
Dobbins Afb, GA

Spray Foam Insulation
Alteration
Bidding
GA

Willow Glen Apartments Fire Damage Unit Repairs
Post-Bid
Columbus, GA 31906

Temporary Courtroom Build Out
Results
Cumming, GA

Orsat at Fox Building Repairs
Renovation
Bidding
Decatur, GA 30034

Selective Improvements at Four Developments
Alteration
Post-Bid
$350,000 est. value
Metter, GA

Painting and Repairs of Fire Maintenance Building
Results
Cumming, GA

Last Updated 04/05/2022 02:23 PM
Project Title

Paint Chip Mitigation

Physical Address View project details and contacts
City, State (County) GA 31547   (Camden County)
Category(s) Environmental, Single Trades
Sub-Category(s) Finishes/Interior, Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Paint chip mitigation, Contractor shall provide all facilities, tools, labor, equipment, materials, transportation, supervision and administrative support required for the installation and subsequent removal of a temporary barrier below the ceiling, approximately 100' tall, to catch falling debris before it reaches the Production floor.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents