Similar Projects
Orange Tree WWTP Walkway Improvement
Post-Bid
Less than $99,600 est. value
FL

US 41 East Mid-Block Crosswalk Improvements
Post-Bid
Less than $50,000 est. value
Naples, FL 33939

Fakahatchee Strand Preserve State Park – Big Cypress Parking Improvements
Results
$4,800,000 est. value
Copeland, FL 34137

Parking Lot GC
Term Contract
Results
Naples, FL 34112

Concrete: Sidewalks, Curbs and Gutters, and Related Items
Term Contract
Post-Bid
Less than $1,000,000 est. value
Chokoloskee, Naples, FL 33939

Clam Pass Park Restroom Expansion and Boardwalk Modifications Project
Results
Less than $1,900,000 est. value
Naples, FL 34103

Design Build Step 1-Immokalee Area Improvements - Tiger Grant
Post-Bid
$16,400,000 est. value
Immokalee, FL 34142

Bayshore MSTU Annual Maintenance - Sidewalk Paver Repair and Replacement
Term Contract
Results
$10,000 to $12,000 est. value
Naples, FL 34112

Pelican Bay Sidewalk Replacement Phase 1
Post-Bid
$709,000 est. value
Naples, North Naples, FL

Olde Marco On-Street Parking Project
Results
Less than $400,000 est. value
Marco Island, FL

Immokalee Sidewalks Phase II Project
Results
Less than $940,000 est. value
Naples, FL 34112

Bayshore CRA Community Parking Lot
Results
Less than $500,000 est. value
Naples, FL 34112

CDBG River Park - 12th Street Sidewalk Connection
Results
Naples, FL 34102

Balfour Driveway Sidewalk Project
Results
Less than $445,000 est. value
Marco Island, FL 34145

Stilling Well Walkway Replacement GG6-7, DSOTO10 and CORK1 Stilling Wells
Results
$336,676 to $372,116 est. value
FL

Last Updated 04/23/2021 08:13 AM
Project Title

San Marco Road Shared Pathway (from Vintage Bay Drive to Goodland Drive)

Physical Address View project details and contacts
City, State (County) Marco Island, FL 34145   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a 10-ft. wide concrete sidewalk along San Marco Road on the south side of the road from 400 ft. east of Vintage Bay Drive (Marco Island Academy) to Goodland Drive (CR 92A). This project will connect the approved San Marco Road to Goodland Phase I Project to the existing pathway to Goodland along CR 92A.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents