Similar Projects
Heating Ventilation and Air Conditioning (HVAC) Maintenance and Repair Services
Alteration
Bidding
$1,278,078 est. value
Tampa, FL

Hvac Preventative Maintenance Services
Post-Bid
Clewiston, Fort Pierce, Hollywood, Immokalee, Naples, Okeechobee, Tampa, FL 33024

HVAC and Mechanical Products
Term Contract
Post-Bid

Heat Treating Furnace
Results
Tampa, FL 33621

Mobile Chiller and Generator System
Results
Less than $986,700 est. value
Tampa, FL 33601

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Spot Coolers Portable Water Cooled Air Conditioners
Term Contract
Results
Tampa, FL 33601

Chamberlain High School, Partial HVAC Replacement Project
Post-Bid
Tampa, FL 33612

Rooftop Unit (RTU) Replacement
Results

Davidsen Middle School HVAC Upgrades
Post-Bid
Tampa, FL 33626

AC Installation at AWTP Buildings 002 and 028
Results
Tampa, FL

Citywide HVAC Repair
Term Contract
Post-Bid
Plant City, FL

USF Southeast Chiller Plant Chiller 4 Addition - Mechanical Equipment Purchase
Results
Tampa, FL

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Miscellaneous Facilities R3M HVAC
Term Contract
Results
$2,250,000 est. value
Tampa, FL

Reported 05/06/2022 12:00 AM
Project Title

CRAC Replacement - Purchase, Delivery and Turnkey Replacement Of Tampa WFO (Ruskin) Computer Room Air Conditioning Units and Other HVAC Components

Physical Address View project details and contacts
City, State (County) Ruskin, FL   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and materials to replace existing CRAC unit with a new system serving site Equipment, Electric, and Communications Rooms. Based upon heating & cooling loads, the TBW WFO will require a 10-ton Liebert model DS035ADA1EI213A and matching condenser model MCS056E8ADN172. The new unit will match unit installed in 2020 and function with Liebert Controller. The System must continually maintain rooms between 65-74 degrees Fahrenheit and 45-55% Relative Humidity. All new systems must have N+1 redundancy to ensure system availability in the event of component failure. Components (N) must have at least one independent backup component (+1). New systems must automatically switch lead system to lag each month to balance operating hours between primary and standby system. Enable monitoring and control of new systems through integration with existing Building Automation System (BMS) which is Automated Logic Controls (ALC) and Liebert Control Panel. Refer to as-built mechanical drawings for original installation (Copies available upon request). Heating and cooling must be maintained in the Equipment Room 24 hours x 7 days per week without interruption.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents