Similar Projects
USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

J--The Old State House Systems Upgrades
Renovation
Design
$1,000,000 to $5,000,000 est. value
Boston, MA 02109

Invasive Pest Management Services FY22
Term Contract
Bidding
Boston, MA

Ground Lease of 7 Channel Street (Parcel U) In the Raymond L.Flynn Marine Park
New Construction
Bidding
$250,000 est. value
Boston, MA

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Snow Plowing and Removal in the Raymond L. Marine Park
Term Contract
Sub-Bidding
$225,000 CJ est. value
Boston, MA 02203

Lindemann Building Envelope and Roof Repairs - Filed Sub-Bids
Post-Bid
$3,072,113 est. value
Boston, MA 02114

Boston Engagement Center
Post-Bid
Boston, MA

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

JOC Order Contracting Region A
Results
$10,000,000 est. value

Suffolk Downs Station Improvements
Renovation
Design

Scheduled and Emergency Pavement Repairs and Improvements at Various Locations in Area D
Term Contract
Sub-Bidding
$1,659,654 CJ est. value
Taunton, MA 02780

Project Management Services for the Accelerated Repair Program
Post-Bid
Boston, MA

Sumner and Callahan Tunnel Vent Building and Callahan Pump Station Mechanical and Electrical Improvements - General Bid
Results
Less than $23,085,000 est. value
Boston, MA 02101

GSA Region 1 Construction IDIQ - North Zone
Renovation
Design
$250,000 est. value
Boston, MA

Last Updated 07/22/2022 02:35 AM
Project Title

Maintenance Service for Burner and Fuel Management Systems

Physical Address View project details and contacts
City, State (County) Boston, MA 02128   (Suffolk County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Misc. Buildings, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Q & A Deadline 07/27/2022 01:00 PM EDT Remarks All questions will be answered on portal If you have any questions please email purchasing@massport.com The Authority intends to enter into one or more Purchase Order(s) for the Scope of Service The term of the Purchase Order(s) for shall be three (3) years with two (2) one (1) year renewal options to extend. The Authority reserves its rights with regard to earlier termination of the Purchase Order in accordance with the terms therein. The Contractor shall perform Maintenance Services on the burner and fuel management systems for the Massport Central Heating Plant at Logan International Airport. These maintenance services shall be performed on a time and materials basis, and shall include the following services: Burner Management Systems - flame scanners, control and flow switches, level controls and fuel safety shut off valves. Flame and annunciation systems. Smoke detection and recording devices. All work will be performed Monday - Friday during normal business hours of 7:00am - 5:00 pm, emergency services may be required and must be approved by the department head. On site training must be provided by the Contractor to Massport personnel and must include training, materials, manuals, service guides, configuration data, technical bulletins, specifications and any application notes. Provision of twenty-four (24) hours, seven (7) days per week service, with a one and one-half (1-1/2) hour response time for emergency requests All travel and related costs must be included in your price quote. The Authority reserves the right to add or remove locations at its sole discretion during the term of the resulting Agreements.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents