Similar Projects
J Avenue Filter Building Roof Replacement - City of Cedar Rapids
Renovation
Conception
$1,250,000 CJ est. value
Cedar Rapids, IA 52402

Nutrient Reduction Modifications - Phase 2 - City of Ames
New Construction, Infrastructure
Conception
$14,260,000 CJ est. value
Ames, IA 50010

Digester Complex Rehabilitation - V3151 - City of Iowa City
Renovation
Design
$10,621,000 CJ est. value
Iowa City, IA 52241

Cogeneration System Maintenance - City Of Ames
Renovation, Infrastructure
Design
$1,335,000 CJ est. value
Ames, IA 50010

Wastewater Treatment Facility Improvements
Renovation, Infrastructure
Bidding
$2,077,275 CJ est. value
Cincinnati, IA 52549

Filter 1 Media Replacement Oskaloosa Municipal Water Department (OMWD) - Oskaloosa, Iowa - 2023
Infrastructure
Bidding
$92,400 CJ est. value
Oskaloosa, IA 52577

Sanitary Sewer Improvements Division 1 Rebid
Infrastructure
Post-Bid
$350,000 CJ est. value
Randolph, IA 51649

Water Treatment Facility Improvements
Renovation
Post-Bid
$725,000 CJ est. value
Webster City, IA 50595

Earlham Lagoon Upgrades
Renovation
Results
$3,979,000 est. value
Earlham, IA 50072

WRF Aeration Basin Sensor Improvements
New Construction
Results
Less than $1,588,000 est. value
Des Moines, IA 50317

Wastewater Treatment Plant - City of Humboldt
New Construction, Infrastructure
Pending Verification
$3,400,000 CJ est. value
Humboldt, IA 50548

Rebuild J Avenue and NE Water Treatment Plant
Infrastructure, Build-out
Pending Verification
$83,900,000 CJ est. value
Cedar Rapids, IA 52401

Water & Resource Recovery Center - Boiler 2 - City of Dubuque
Renovation
Conception
$350,000 CJ est. value
Dubuque, IA 52003

Demolition of Old Water Treatment Plant & TSC Improvements - City of Ames
Demolition
Design
$1,141,000 CJ est. value
Ames, IA 50010

WRF Site Security and Access Improvements
New Construction, Renovation, Infrastructure
Bidding
$9,672,000 CJ est. value
Des Moines, IA 50317

Last Updated 10/16/2023 09:35 PM
Project Title

Wastewater Treatment Facility Improvements

Physical Address View project details and contacts
City, State (County) Monticello, IA 52310   (Jones County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $24,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The Wastewater Treatment Plant Improvements project includes, but is not limited to, furnishing all labor, material and equipment necessary for construction and installation of: submersible pumps in the raw influent lift station, screening wash and compactor, replacing grit classifier equipment, cast-in place tanks for an activated sludge treatment system, various in tank equipment for the active sludge treatment system, non-contact ultraviolet disinfection system, precast effluent reuse lift station and submersible pumps, precast effluent pump station and submersible pumps, precast manholes, new precast controls building, rotary sludge dewatering press, precast building and storage area for sludge handling, non-potable water storage tank, non-potable water booster pump station, water main extension, non-potable water main, force main, gravity sewer main, aeration blowers, demolition of existing tanks and buildings, sludge removal, site work, paving, electrical, mechanical, plumbing and other miscellaneous items. A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10) percent of Bidder's maximum Bid price and in the form of a certified check or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Contract or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. The Work will be substantially completed within 915 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 975 calendar days after the date when the Contract Times commence to run. Contractor shall pay Owner $3,000.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $3,000.00 for each day that expires after such time until the Work is completed and ready for final payment. Liquidated damages for failing to timely attain Substantial Completion and final completion are not additive and will not be imposed concurrently. To the extent allowed by Federal law and regulation, by virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents