Similar Projects
Last Updated | 10/16/2023 09:35 PM |
Project Title | Wastewater Treatment Facility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Monticello, IA 52310 (Jones County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $24,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes the following Work: The Wastewater Treatment Plant Improvements project includes, but is not limited to, furnishing all labor, material and equipment necessary for construction and installation of: submersible pumps in the raw influent lift station, screening wash and compactor, replacing grit classifier equipment, cast-in place tanks for an activated sludge treatment system, various in tank equipment for the active sludge treatment system, non-contact ultraviolet disinfection system, precast effluent reuse lift station and submersible pumps, precast effluent pump station and submersible pumps, precast manholes, new precast controls building, rotary sludge dewatering press, precast building and storage area for sludge handling, non-potable water storage tank, non-potable water booster pump station, water main extension, non-potable water main, force main, gravity sewer main, aeration blowers, demolition of existing tanks and buildings, sludge removal, site work, paving, electrical, mechanical, plumbing and other miscellaneous items. A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10) percent of Bidder's maximum Bid price and in the form of a certified check or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Contract or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. The Work will be substantially completed within 915 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 975 calendar days after the date when the Contract Times commence to run. Contractor shall pay Owner $3,000.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $3,000.00 for each day that expires after such time until the Work is completed and ready for final payment. Liquidated damages for failing to timely attain Substantial Completion and final completion are not additive and will not be imposed concurrently. To the extent allowed by Federal law and regulation, by virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |