Similar Projects
Paving - W. Third St. (Industrial Park Rd to Buffalo Creek Bridge - City of Farmville
Infrastructure
Conception
$423,080 est. value
Farmville, VA 23901

Prince Edward Business Park Access Road Project
Infrastructure
Bidding
$300,000 est. value
Farmville, VA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Post-Bid
Less than $775,000 est. value

2021 Plant Mix
Results
Less than $2,400,000 est. value

2021 Plant Mix
Results
Less than $3,389,000 est. value

2021 Plant Mix
Results
Less than $1,586,000 est. value

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

2022 Surface Treatment
Infrastructure
Results
$1,778,000 est. value

2022 Latex Modified
Infrastructure
Results
$749,000 est. value

2022 Latex Modified
Infrastructure
Results
$2,130,000 est. value

2022 Surface Treatment
Infrastructure
Results
$875,000 est. value

Reported 06/28/2022 12:00 AM
Project Title

Asphalt Patching Farmville Residency

Physical Address View project details and contacts
City, State (County) Farmville, VA (Buckingham, Charlotte, Cumberland, Prince Edward Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor(s) shall provide all required equipment with qualified, experienced operators, crews, fuel, tools, maintenance, mobilization, supervision, disposal, and all incidentals as necessary to provide incidental asphalt patching on primary and secondary roadways. The work will consist of, but not be limited to, removal of deteriorated pavement, milling, patching, surface preparation, bituminous pavement patching, joint patching and disposal. Pavement patching operations shall be limited to no more than 500' in length. Work shall be performed on an as needed basis on both primary and secondary routes. All work shall be performed under VDOT supervision. VDOT will provide plant mix (bituminous concrete), liquid tack and any needed stone materials. VDOT may require multiple crews to work simultaneously within the lot awarded, or simultaneously in each lot if awarded both lots.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents