Similar Projects
Castle Island Montessori School Relocation
Renovation - 6,400 SF
Design
Albany, NY 12207

New FRP Heavy Duty Doors & Hardware Purchase And Installation
Renovation
Post-Bid
Brewster, NY 10509

Peru CSD - 2018 Capital Project - Phase 3
Post-Bid
Less than $4,603,000 est. value
Peru, NY 12972

Hammondsport CSD 2017 Capital Improvements
Renovation
Results
Less than $5,270,000 est. value
Hammondsport, NY 14840

Van Cortlandtville Elementary School Connecting Corridor and Related Work
Results
Less than $800,000 est. value
Mohegan Lake, NY 10547

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Germantown C.S.D. 2015 Capital Projects
Construction
Germantown, NY

Salzman School
New Construction - 1,344 SF
Pending Verification
Less than $500,000 CJ est. value
Hartwick, NY 13810

Greece CSD-Reimagine Greece CIP Phase R2
Post-Bid
Greece, NY

Liberty Central School District Elementary School - Gymnasium Improvements
Results
Liberty, NY 12754

Reconstruction of Rhinebeck Chancellor Livingston Elementary School, Rhinebeck Middle School/High School
Construction
Rhinebeck, NY 12572

Elmira CSD - 2019-20 Capital Outlay Project - Diven ES
Post-Bid
Less than $80,000 est. value
Elmira, NY 14901

Hutchinson Elementary School Project: Construction of New School Building, Demolition of Existing School and Demolition of Modular Building
New Construction, Demolition
Results
Pelham, NY 10803

William E Cottle Elementary School Additions And Alterations
Renovation, Addition
Construction
Less than $7,600,000 est. value
Eastchester, NY 10709

Clarkstown CSD Time and Materials Project
Post-Bid
New City, NY 10956

Last Updated 07/22/2021 10:15 AM
Project Title

Webster Central School District 2018 Capital Improvement Project - Elementary Schools

Physical Address View project details and contacts
City, State (County) Webster, NY 14580   (Monroe County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Commenced June 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will be constructed under single prime contract. Contracts for this Project include the following: a. Contract No. 601: General Trades/ General Construction b. Contract No. 602: Mechanical Work c. Contract No. 603: Plumbing Work d. Contract No. 604: Electrical Work e. Contract No. 605: Site Work f. Contract No. 606: Ceiling and Pegboard Work

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents